New Build Screeding · Somerset
Cemfloor-Certified New Build Screeding Across Cheddar
Cheddar new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.
Keep your Cheddar plots on programme
Screed is often the trade holding up the schedule. Let's agree pump access and plot sequencing before it becomes a bottleneck.
Talk to us07791 510849 WhatsApp usGet a fixed price for Cemfloor-Certified New Build Screeding Across Cheddar
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Cheddar new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Cheddar development moves through screed without a gap in the build sequence.
Most of our Cheddar jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Cheddar sits Weston-super-Mare (10 mi), and we work the surrounding villages on the same week's diary.
Right fit for Cheddar homeowners and contractors alike
Cheddar runs a healthy mix of residential renovation and small-to-medium commercial fit-out. We price both, and run both with the same fixed-price approach.
Why Cheddar site context matters
County
Somerset
District
Sedgemoor
Postcode
BS27
Nearest city
Weston-super-Mare (10 mi)
Nearest motorway
M5 (J22, ~8 mi)
Primary A-road
A371
Local industries
independent retail, market-town hospitality
Common builds
Georgian townhouses, stone cottages
New Build Screeding in Cheddar — how it works
Output on a typical Cheddar plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Cheddar scheme, so plot 1 and plot 40 come out identical.
How a Cheddar pour runs
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Cheddar-area projects



Specifications suited to Cheddar builds
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Nearby villages and towns
What people in Cheddar usually ask
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Cheddar site come out to the same depth and finish.
How many plots can you screed per day on a Cheddar development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you provide RAMS for a new build site in Cheddar?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
Do you price the whole Cheddar site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Can you scale up if the Cheddar programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Why Cheddar clients pick us
- 01Cemfloor-certified, fully insured, CDM-aware
- 02Coordinated with most South West UFH installers
- 03Pre-start meeting standard on every commercial job
- 04Local knowledge — we know the M5 (J22, ~8 mi) access window and A371 traffic patterns
Keep your Cheddar plots on programme
Screed is often the trade holding up the schedule. Let's agree pump access and plot sequencing before it becomes a bottleneck.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
