New Build Screeding · Somerset
Highbridge New Build Screeding Specialists
On multi-plot developments in Highbridge we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

Get a fixed price for Highbridge New Build Screeding Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
On multi-plot developments in Highbridge we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Highbridge scheme, so plot 1 and plot 40 come out identical.
Most of our Highbridge jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Highbridge sits Bridgwater (8 mi), and we work the surrounding villages on the same week's diary.
What we plan around in Highbridge
County
Somerset
District
Sedgemoor
Postcode
TA9
Nearest city
Bridgwater (8 mi)
Nearest motorway
M5 (J22, ~2 mi)
Primary A-road
A38
Local industries
Isleport Business Park, distribution
Common builds
Victorian terraces, trade-park units
New Build Screeding in Highbridge — how it works
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Highbridge development moves through screed without a gap in the build sequence.
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Highbridge site rather than a new quote for every unit.
Who this is for in Highbridge
Highbridge skews commercial — trade parks like Isleport Business Park, contractor-led fit-outs, and developer estates. We price as a sub-contractor on programme, with RAMS and CDM documentation issued ahead of mobilisation.
Materials and systems we use in Highbridge
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Latest jobs across Somerset



What backs our Highbridge work
Hundreds of square metres poured around Highbridge in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Highbridge screed questions, answered
Do you handle underfloor heating across a whole Highbridge development?+
Yes, where UFH is part of the development spec we coordinate pressure-testing and pour sequencing with the M&E contractor plot by plot.
How many plots can you screed per day on a Highbridge development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you provide RAMS for a new build site in Highbridge?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Highbridge site come out to the same depth and finish.
Can you scale up if the Highbridge programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Adjacent areas — usually same-week diary
New build screeding in Highbridge comes down to one thing above all else, keeping the programme moving, get the plot sequence and pump access right and every trade behind you stays on track.
Multi-plot pours across TA9
From a handful of units to a full Highbridge phase, we plan crew and pump around your build programme, not ours.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
