Underfloor Heating Screed · Somerset

Highbridge Underfloor Heating Screed Specialists

Across Highbridge we work hand-in-hand with UFH installers — they lay and pressure-test the pipes, we pour around them the next day at the right depth and thermal performance.

Liquid screed work near Highbridge Underfloor Heating Screed Specialists
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Highbridge Underfloor Heating Screed Specialists

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Across Highbridge we work hand-in-hand with UFH installers — they lay and pressure-test the pipes, we pour around them the next day at the right depth and thermal performance.

Liquid UFH screed lets you run a thinner build-up than traditional bays — useful when ceiling heights or threshold levels are tight in Highbridge renovations.

Most of our Highbridge jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Highbridge sits Bridgwater (8 mi), and we work the surrounding villages on the same week's diary.

Why Highbridge site context matters

County

Somerset

District

Sedgemoor

Postcode

TA9

Nearest city

Bridgwater (8 mi)

Nearest motorway

M5 (J22, ~2 mi)

Primary A-road

A38

Local industries

Isleport Business Park, distribution

Common builds

Victorian terraces, trade-park units

Underfloor Heating Screed in Highbridge — how it works

We pour Cemfloor Therm liquid screed over your UFH pipes at 50mm above pipe (typically 65-75mm total over insulation), giving full pipe encapsulation, fast thermal response and a finished surface flat to SR1.

The screed self-levels around every loop, eliminating the voids you get under hand-laid traditional screed. That means the floor responds faster when the heating calls for it, and stores less wasted heat.

Right fit for Highbridge contractors and developers

Highbridge skews commercial — trade parks like Isleport Business Park, contractor-led fit-outs, and developer estates. We price as a sub-contractor on programme, with RAMS and CDM documentation issued ahead of mobilisation.

Specifications suited to Highbridge builds

Cemfloor Therm

Liquid screed engineered for UFH — lambda 2.1 W/mK, fast response.

PIR/Phenolic insulation board

70-150mm typical depending on build regs U-value target.

Edge insulation strip

Critical around UFH zones to allow thermal expansion.

Pressure-testing kit

Pipes held at 6 bar through the pour to flag any damage immediately.

Latest jobs across Somerset

UFH screed in a kitchen-diner extension, Taunton
UFH screed in a kitchen-diner extension, Taunton
Industrial-scale pour at Blackbrook, Taunton
Industrial-scale pour at Blackbrook, Taunton
UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth

What backs our Highbridge work

Hundreds of square metres poured around Highbridge in the last 12 months

Single-team continuity — same crew, same standards, every job

Written fixed-price quotes — no day-rate creep

Moisture-test handover record so flooring contractors take the slab on without dispute

Highbridge screed questions, answered

How does this affect my floor coverings in Highbridge?+

Once commissioned and the floor moisture content is signed off (CM test, typically below 0.5% for tile), most coverings go down as normal. We hand you a commissioning record.

When can I switch the underfloor heating on in Highbridge?+

On Cemfloor Therm we typically start a slow commissioning cycle from day 7, ramping 5°C per day per manufacturer spec. Forcing it earlier risks cracking, so we hold Highbridge clients to the schedule.

What depth of screed over UFH pipes do you recommend?+

Minimum 50mm cover above the highest pipe — usually a 65-75mm total slab over insulation. Thicker if you want more thermal mass.

Will the screed crack as the UFH heats up?+

Properly isolated at the edges and at doorway joints, no. We pour with the pipes pressure-tested and follow a controlled commissioning schedule.

Does liquid UFH screed improve EPC ratings?+

Indirectly — yes. Faster response and lower running temperatures help heat-pump COP, which feeds into your SAP/EPC. We'll share the manufacturer data your assessor needs.

What if a pipe leaks during the pour?+

Pipes are held at 6 bar through the pour. Any pressure drop is flagged immediately and we stop, fix and continue — this is exactly why we keep the manifold under test.

From the first site visit to the final laitance sand, our Highbridge jobs are run as one fixed-price piece of work — no creeping extras.

Talk to a Highbridge-area screeder

We'll walk the build with you over a phone call — no hard sell, just honest numbers.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp