Liquid screed pour near Cemfloor-Certified New Build Screeding Across Mark

New Build Screeding · Somerset

Cemfloor-Certified New Build Screeding Across Mark

Mark new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Cemfloor-Certified New Build Screeding Across Mark

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Mark new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.

We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Mark development moves through screed without a gap in the build sequence.

Most of our Mark jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Mark sits Bridgwater (10 mi), and we work the surrounding villages on the same week's diary.

Local facts that shape every Mark pour

County

Somerset

District

Sedgemoor

Postcode

TA9

Nearest city

Bridgwater (10 mi)

Nearest motorway

M5 (J22, ~6 mi)

Primary A-road

B3139

Local industries

Levels agriculture, rural haulage

Common builds

Levels farmhouses, raised new-builds

Common briefs across Mark

  • Levels farmhouses — a regular brief in Mark
  • Raised new-builds — a regular brief in Mark
  • Converted longhouses — a regular brief in Mark
  • Packhouse retrofits — a regular brief in Mark
  • Levels agriculture — a regular brief in Mark

New Build Screeding in Mark — how it works

We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Mark development moves through screed without a gap in the build sequence.

Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Mark site rather than a new quote for every unit.

Cemfloor systems for Mark

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

Latest jobs across Somerset

Industrial-scale pour at Blackbrook, Taunton
Industrial-scale pour at Blackbrook, Taunton
UFH screed in a kitchen-diner extension, Taunton
UFH screed in a kitchen-diner extension, Taunton
Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter

What backs our Mark work

  1. 01Cemfloor-certified, fully insured, CDM-aware
  2. 02Coordinated with most South West UFH installers
  3. 03Pre-start meeting standard on every commercial job
  4. 04Local knowledge — we know the M5 (J22, ~6 mi) access window and B3139 traffic patterns

Mark screed questions, answered

How quickly can follow-on trades get back onto a plot?+

Liquid screed allows light foot traffic from 24-48 hours per plot, which is why most Mark developers specify it over traditional screed on programme-driven builds.

How many plots can you screed per day on a Mark development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

Do you provide RAMS for a new build site in Mark?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

Can you keep the same build-up across every plot?+

Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Mark site come out to the same depth and finish.

Can you scale up if the Mark programme accelerates?+

Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.

From the pre-start meeting to the last plot's moisture sign-off, our Mark new build jobs run as one coordinated package, priced against the whole site, not negotiated unit by unit.

Book your Mark development into the diary

Multi-plot schemes need booking well ahead. Reserve your Mark pour dates now and we'll confirm logistics with your site manager.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp