Liquid Screed Installation — Cheddar, Somerset
Cheddar is a working market town balancing heritage retrofits with fresh housing pours. We work with that, not against it — sizing the pour, the access and the dry-time to suit.
Talk to a Cheddar-area screeder
Diary fills 2-4 weeks ahead — pin a date and we'll confirm logistics.
Call 07765 71260907765 712609Cheddar is a working market town balancing heritage retrofits with fresh housing pours. We work with that, not against it — sizing the pour, the access and the dry-time to suit.
We're Cheddar is a working market town balancing heritage retrofits with fresh housing pours. Our coverage runs across BS27, taking in Cliffs-side and out toward Draycott-side trade units, with the M5 (J22, ~8 mi) on hand for materials and pump trucks.
Most of our Cheddar jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Cheddar sits Weston-super-Mare (10 mi), and we work the surrounding villages on the same week's diary.
Built for Cheddar homeowners and contractors alike
Cheddar runs a healthy mix of residential renovation and small-to-medium commercial fit-out. We price both, and run both with the same fixed-price approach.
Local facts that shape every Cheddar pour
County
Somerset
District
Sedgemoor
Postcode
BS27
Nearest city
Weston-super-Mare (10 mi)
Nearest motorway
M5 (J22, ~8 mi)
Primary A-road
A371
Local industries
independent retail, market-town hospitality
Common builds
Georgian townhouses, stone cottages
Liquid screed in Cheddar — how it works
Build-up is straightforward: insulation, DPM, edge isolation, pour. We handle the lot or we work to the main contractor's substrate — whichever suits your Cheddar job.
On larger Cheddar jobs we mobilise a static mixer; on residential we use ready-mix delivery and a smaller pump. Either way, the finished floor reads the same.
Step-by-step for a Cheddar job
- 1
Site visit and written quote
- 2
Prep — insulation, DPM, edge isolation, UFH coordination
- 3
Pump day — single-visit pour, level and spike-roll
- 4
Cover and cure for 24-48 hours
- 5
Moisture-test sign-off, floor coverings
Floors poured around Cheddar



Cemfloor systems for Cheddar
Cemfloor CT-C30-F6
Cement-based liquid screed — robust, low-shrinkage, fast-drying.
Cemfloor Therm
Thermally-optimised for UFH.
PIR insulation + DPM
Build-up tuned to your build regs U-value.
Other areas we cover near Cheddar
Common Cheddar build questions
Can you give a fixed-price quote?+
Yes — every Cheddar quote is a written fixed price against a defined scope. No day-rate surprises.
Do you handle UFH coordination?+
Yes — we work with whichever UFH installer is on your Cheddar project and align dates with their pressure-test schedule.
Do you offer a guarantee?+
As a Cemfloor-certified installer, qualifying installs are backed by a 10-year manufacturer-supported guarantee.
How long does the floor take to dry in Cheddar?+
Roughly one day per millimetre of depth, ambient conditions allowing. We'll give you specific guidance for your Cheddar pour.
Do you cover Cheddar?+
Yes — Cheddar sits inside our regular 30-mile working radius and we have active diary there most months.
How quickly can you start on a Cheddar job?+
Diary is usually 2-4 weeks. We'll give you a firm date with your quote.
Proof from the Somerset workload
- 01Cemfloor-certified, fully insured, CDM-aware
- 02Coordinated with most South West UFH installers
- 03Pre-start meeting standard on every commercial job
- 04Local knowledge — we know the M5 (J22, ~8 mi) access window and A371 traffic patterns