New Build Screeding · Somerset
Shepton Mallet New Build Screeding Specialists
New build sites in Shepton Mallet run to a programme, not a wish list, and screed is usually the trade holding up everything behind it. We sequence plot by plot so your follow-on trades never sit idle.
Get a fixed price for Shepton Mallet New Build Screeding Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
New build sites in Shepton Mallet run to a programme, not a wish list, and screed is usually the trade holding up everything behind it. We sequence plot by plot so your follow-on trades never sit idle.
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Shepton Mallet site rather than a new quote for every unit.
Most of our Shepton Mallet jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Shepton Mallet sits Bridgwater (20 mi), and we work the surrounding villages on the same week's diary.
Where liquid screed earns its keep in Shepton Mallet
- Georgian townhouses — a regular brief in Shepton Mallet
- Stone cottages — a regular brief in Shepton Mallet
- Small new-build estates — a regular brief in Shepton Mallet
- High-street shop retrofits — a regular brief in Shepton Mallet
- Independent retail — a regular brief in Shepton Mallet
Right fit for Shepton Mallet homeowners and contractors alike
Shepton Mallet runs a healthy mix of residential renovation and small-to-medium commercial fit-out. We price both, and run both with the same fixed-price approach.
New Build Screeding in Shepton Mallet — how it works
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Shepton Mallet development moves through screed without a gap in the build sequence.
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Shepton Mallet site rather than a new quote for every unit.
Specifications suited to Shepton Mallet builds
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
How a Shepton Mallet pour runs
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Latest jobs across Somerset



Adjacent areas — usually same-week diary
What backs our Shepton Mallet work
Shepton Mallet screed questions, answered
Do you offer a guarantee on new build plots?+
Yes, as a Cemfloor-certified installer, qualifying plots are backed by the manufacturer's 10-year guarantee, issued per unit as part of the handover pack.
Do you provide RAMS for a new build site in Shepton Mallet?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
How many plots can you screed per day on a Shepton Mallet development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Can you scale up if the Shepton Mallet programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Shepton Mallet site come out to the same depth and finish.
Multi-plot pours across BA4
From a handful of units to a full Shepton Mallet phase, we plan crew and pump around your build programme, not ours.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
