Underfloor Heating Screed · Somerset

Shepton Mallet Underfloor Heating Screed Specialists

Underfloor heating only works as well as the screed encasing it — and in Shepton Mallet that means a high-thermal-conductivity liquid pour that wraps every pipe with no voids.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Shepton Mallet Underfloor Heating Screed Specialists

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Underfloor heating only works as well as the screed encasing it — and in Shepton Mallet that means a high-thermal-conductivity liquid pour that wraps every pipe with no voids.

The screed self-levels around every loop, eliminating the voids you get under hand-laid traditional screed. That means the floor responds faster when the heating calls for it, and stores less wasted heat.

Most of our Shepton Mallet jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Shepton Mallet sits Bridgwater (20 mi), and we work the surrounding villages on the same week's diary.

What Shepton Mallet builds usually need

  • Georgian townhouses — a regular brief in Shepton Mallet
  • Stone cottages — a regular brief in Shepton Mallet
  • Small new-build estates — a regular brief in Shepton Mallet
  • High-street shop retrofits — a regular brief in Shepton Mallet
  • Independent retail — a regular brief in Shepton Mallet

Built for Shepton Mallet homeowners and contractors alike

Shepton Mallet runs a healthy mix of residential renovation and small-to-medium commercial fit-out. We price both, and run both with the same fixed-price approach.

Underfloor Heating Screed in Shepton Mallet — how it works

We pour Cemfloor Therm liquid screed over your UFH pipes at 50mm above pipe (typically 65-75mm total over insulation), giving full pipe encapsulation, fast thermal response and a finished surface flat to SR1.

The screed self-levels around every loop, eliminating the voids you get under hand-laid traditional screed. That means the floor responds faster when the heating calls for it, and stores less wasted heat.

Cemfloor systems for Shepton Mallet

Cemfloor Therm

Liquid screed engineered for UFH — lambda 2.1 W/mK, fast response.

PIR/Phenolic insulation board

70-150mm typical depending on build regs U-value target.

Edge insulation strip

Critical around UFH zones to allow thermal expansion.

Pressure-testing kit

Pipes held at 6 bar through the pour to flag any damage immediately.

Step-by-step for a Shepton Mallet job

  1. 1

    UFH installer fits manifold, pipes and pressure-tests to 6 bar

  2. 2

    We confirm edge insulation, DPM and pipe coverage depth

  3. 3

    Pump and level the screed with pipes still under pressure

  4. 4

    Slow commissioning of the heating — usually after 7 days, ramping per manufacturer spec

  5. 5

    Floor coverings once moisture is signed off and commissioning is complete

Latest jobs across Somerset

UFH screed in a kitchen-diner extension, Taunton
UFH screed in a kitchen-diner extension, Taunton
UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth
Self-build UFH pour near Tiverton
Self-build UFH pour near Tiverton

What backs our Shepton Mallet work

Backed by 5★ Google and Yell reviews from across Somerset
Same-day quotes on most residential jobs
10-year Cemfloor manufacturer-supported guarantee on qualifying installs
Direct relationships with local insulation and UFH suppliers — fewer middlemen, fewer surprises

Shepton Mallet screed questions, answered

Can you screed over wet UFH and electric UFH?+

Yes — Cemfloor Therm encapsulates both. Electric mat systems usually take a thinner cover; wet pipes need the 50mm minimum.

What depth of screed over UFH pipes do you recommend?+

Minimum 50mm cover above the highest pipe — usually a 65-75mm total slab over insulation. Thicker if you want more thermal mass.

Will the screed crack as the UFH heats up?+

Properly isolated at the edges and at doorway joints, no. We pour with the pipes pressure-tested and follow a controlled commissioning schedule.

Does liquid UFH screed improve EPC ratings?+

Indirectly — yes. Faster response and lower running temperatures help heat-pump COP, which feeds into your SAP/EPC. We'll share the manufacturer data your assessor needs.

When can I switch the underfloor heating on in Shepton Mallet?+

On Cemfloor Therm we typically start a slow commissioning cycle from day 7, ramping 5°C per day per manufacturer spec. Forcing it earlier risks cracking, so we hold Shepton Mallet clients to the schedule.

What if a pipe leaks during the pour?+

Pipes are held at 6 bar through the pour. Any pressure drop is flagged immediately and we stop, fix and continue — this is exactly why we keep the manifold under test.

Talk to a Shepton Mallet-area screeder

We'll walk the build with you over a phone call — no hard sell, just honest numbers.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp