Traditional Sand & Cement Screed · Devon
Traditional Sand & Cement Screed — Dalwood, Devon
Dalwood builders sometimes need a screed that can be laid in a bucket-and-barrow operation with no pump access, or that has to tie into an external step, drain or wet room upstand. That is exactly where sand and cement wins over a liquid pour.
Get a fixed price for Traditional Sand & Cement Screed — Dalwood, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Dalwood builders sometimes need a screed that can be laid in a bucket-and-barrow operation with no pump access, or that has to tie into an external step, drain or wet room upstand. That is exactly where sand and cement wins over a liquid pour.
Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.
Most of our Dalwood jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Dalwood sits Honiton (5 mi), and we work the surrounding villages on the same week's diary.
Traditional Sand & Cement Screed in Dalwood — how it works
Unlike a self-levelling liquid screed, sand and cement is placed and compacted by hand, so we control the fall towards a drain, form an upstand at a threshold, or feather it into an existing floor level in a way a pumped pour cannot.
Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.
Dalwood at a glance
County
Devon
District
East Devon
Postcode
EX13
Nearest city
Honiton (5 mi)
Nearest motorway
M5 (J28, ~13 mi)
Primary A-road
minor B-roads
Local industries
heritage, agriculture
Common builds
Loughwood Meeting House precinct, cob cottages
Typical Dalwood use cases
- Loughwood Meeting House precinct — a regular brief in Dalwood
- Cob cottages — a regular brief in Dalwood
- Small self-builds — a regular brief in Dalwood
- Heritage — a regular brief in Dalwood
- Agriculture — a regular brief in Dalwood
Recent work near Dalwood



Step-by-step for a Dalwood job
- 1
Site visit to assess substrate, falls, depth and access, since sand and cement can be barrowed where a pump truck cannot reach
- 2
Substrate prep, priming or DPM, and setting out of bay lines and laser levels
- 3
Mix and place the screed in bays, compacting as we go to remove voids
- 4
Hand float or power trowel to a flat, dense SR2 finish
- 5
Protect and allow to cure, typically a day per millimetre of depth after the first 50mm
- 6
Follow-up inspection before floor coverings or tiling begin
Trust points for a Dalwood brief
Within easy reach of Dalwood
Cemfloor systems for Dalwood
Sand and cement (typically 4:1 or 5:1 mix)
Semi-dry, hand-compacted mix ratio adjusted to depth and loading.
SBR bonding agent
Slurry-brushed onto the substrate for bonded screeds under 40mm.
Polypropylene fibre reinforcement
Added to reduce shrinkage cracking on larger bays.
DPM and separating membrane
For unbonded or floating screeds over insulation.
Falls formed to drain outlets
Built into the screed thickness for wet rooms and balconies.
Edge and movement joints
Set at bay lines, doorways and around columns.
FAQs from Dalwood clients
How is sand and cement screed different from liquid screed in Dalwood?+
Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.
What SR rating do you achieve on a trowelled screed?+
We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.
Will the screed crack?+
Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Dalwood job.
Can you match an existing sand and cement floor level?+
Yes, we set datums off your existing finished floor level and build the new screed to match, allowing for whatever covering goes on top.
How long does a sand and cement screed take to dry in Dalwood?+
Roughly a day per millimetre of depth once past the first 50mm, so a 65mm floor is typically ready for coverings in around six to eight weeks, depending on ventilation and site conditions.
Do you use a screed pump for sand and cement in Dalwood?+
On larger jobs, yes, a screed pump can deliver the semi-dry mix into the building, which speeds up placement while keeping the hand-trowelled finish.
Book a bay-laid screed in Dalwood
Hand-trowelled screeds take longer to schedule around drying and access. Get your Dalwood job in the diary early.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700