New Build Screeding · Devon
New Build Screeding — Dalwood, Devon
Developers building across Dalwood need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Get a fixed price for New Build Screeding — Dalwood, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Developers building across Dalwood need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Output on a typical Dalwood plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
Most of our Dalwood jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Dalwood sits Honiton (5 mi), and we work the surrounding villages on the same week's diary.
New Build Screeding in Dalwood — how it works
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Dalwood scheme, so plot 1 and plot 40 come out identical.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Dalwood development moves through screed without a gap in the build sequence.
EX13 access, routes and logistics
County
Devon
District
East Devon
Postcode
EX13
Nearest city
Honiton (5 mi)
Nearest motorway
M5 (J28, ~13 mi)
Primary A-road
minor B-roads
Local industries
heritage, agriculture
Common builds
Loughwood Meeting House precinct, cob cottages
What Dalwood builds usually need
- Loughwood Meeting House precinct — a regular brief in Dalwood
- Cob cottages — a regular brief in Dalwood
- Small self-builds — a regular brief in Dalwood
- Heritage — a regular brief in Dalwood
- Agriculture — a regular brief in Dalwood
Floors poured around Dalwood



What to expect on pour day in Dalwood
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Proof from the Devon workload
Dalwood-area service radius
Materials and systems we use in Dalwood
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Common Dalwood build questions
Are you set up for NHBC or LABC warranty requirements?+
Yes, our build-ups and documentation are prepared to match whichever warranty provider your Dalwood development is registered with.
Do you provide RAMS for a new build site in Dalwood?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How many plots can you screed per day on a Dalwood development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you price the whole Dalwood site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Can you scale up if the Dalwood programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Book your Dalwood development into the diary
Multi-plot schemes need booking well ahead. Reserve your Dalwood pour dates now and we'll confirm logistics with your site manager.