New Build Screeding · Devon

Cemfloor-Certified New Build Screeding Across Kilmington

Kilmington new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Cemfloor-Certified New Build Screeding Across Kilmington

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Kilmington new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.

We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Kilmington development moves through screed without a gap in the build sequence.

Most of our Kilmington jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Kilmington sits Axminster (3 mi), and we work the surrounding villages on the same week's diary.

New Build Screeding in Kilmington — how it works

New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Kilmington scheme, so plot 1 and plot 40 come out identical.

We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Kilmington development moves through screed without a gap in the build sequence.

Local facts that shape every Kilmington pour

County

Devon

District

East Devon

Postcode

EX13

Nearest city

Axminster (3 mi)

Nearest motorway

M5 (J25, ~20 mi)

Primary A-road

A35

Local industries

agriculture, commuter

Common builds

Axe-valley cottages, new self-builds

Common briefs across Kilmington

  • Axe-valley cottages — a regular brief in Kilmington
  • New self-builds — a regular brief in Kilmington
  • Smallholdings — a regular brief in Kilmington
  • Agriculture — a regular brief in Kilmington
  • Commuter — a regular brief in Kilmington

Floors poured around Kilmington

Renovation screed for a barn conversion near Honiton
Renovation screed for a barn conversion near Honiton
Large open-plan pour for a new-build near Cullompton
Large open-plan pour for a new-build near Cullompton
UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth

How a Kilmington pour runs

  1. 1

    Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates

  2. 2

    Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot

  3. 3

    Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn

  4. 4

    Protect each plot for 24-48 hours while the crew moves on to the next

  5. 5

    Moisture testing and a written handover record issued per plot

  6. 6

    Snagging and any remedial work coordinated directly with the site manager before final trades move in

Proof from the Devon workload

  1. 01Cemfloor-certified, fully insured, CDM-aware
  2. 02Coordinated with most South West UFH installers
  3. 03Pre-start meeting standard on every commercial job
  4. 04Local knowledge — we know the M5 (J25, ~20 mi) access window and A35 traffic patterns

Specifications suited to Kilmington builds

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

Common Kilmington build questions

Can you work to our build programme rather than your own diary?+

Yes, that's the point of new build screeding, we plan crew and pump mobilisation around your plot handover dates, not the other way round.

Do you provide RAMS for a new build site in Kilmington?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

How many plots can you screed per day on a Kilmington development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

Can you scale up if the Kilmington programme accelerates?+

Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.

Can you keep the same build-up across every plot?+

Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Kilmington site come out to the same depth and finish.

Keep your Kilmington plots on programme

Screed is often the trade holding up the schedule. Let's agree pump access and plot sequencing before it becomes a bottleneck.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp