Underfloor Heating Screed · Devon
Cemfloor-Certified Underfloor Heating Screed Across Kilmington
Liquid UFH screed in Kilmington replaces the air gaps and voids that bog standard sand-and-cement leaves around pipes, lifting system response and cutting running costs.
Get a fixed price for Cemfloor-Certified Underfloor Heating Screed Across Kilmington
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Liquid UFH screed in Kilmington replaces the air gaps and voids that bog standard sand-and-cement leaves around pipes, lifting system response and cutting running costs.
We pour Cemfloor Therm liquid screed over your UFH pipes at 50mm above pipe (typically 65-75mm total over insulation), giving full pipe encapsulation, fast thermal response and a finished surface flat to SR1.
Most of our Kilmington jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Kilmington sits Axminster (3 mi), and we work the surrounding villages on the same week's diary.
Underfloor Heating Screed in Kilmington — how it works
The screed self-levels around every loop, eliminating the voids you get under hand-laid traditional screed. That means the floor responds faster when the heating calls for it, and stores less wasted heat.
For Kilmington UFH builds the typical sequence is: insulation board down, pipes clipped and pressure-tested, edge insulation in place, then we pump and level in a single visit.
Why Kilmington site context matters
County
Devon
District
East Devon
Postcode
EX13
Nearest city
Axminster (3 mi)
Nearest motorway
M5 (J25, ~20 mi)
Primary A-road
A35
Local industries
agriculture, commuter
Common builds
Axe-valley cottages, new self-builds
Kilmington projects we see most
- Axe-valley cottages — a regular brief in Kilmington
- New self-builds — a regular brief in Kilmington
- Smallholdings — a regular brief in Kilmington
- Agriculture — a regular brief in Kilmington
- Commuter — a regular brief in Kilmington
Recent work near Kilmington



How a Kilmington pour runs
- 1
UFH installer fits manifold, pipes and pressure-tests to 6 bar
- 2
We confirm edge insulation, DPM and pipe coverage depth
- 3
Pump and level the screed with pipes still under pressure
- 4
Slow commissioning of the heating — usually after 7 days, ramping per manufacturer spec
- 5
Floor coverings once moisture is signed off and commissioning is complete
Trust points for a Kilmington brief
- 01Cemfloor-certified, fully insured, CDM-aware
- 02Coordinated with most South West UFH installers
- 03Pre-start meeting standard on every commercial job
- 04Local knowledge — we know the M5 (J25, ~20 mi) access window and A35 traffic patterns
Nearby villages and towns
Specifications suited to Kilmington builds
Cemfloor Therm
Liquid screed engineered for UFH — lambda 2.1 W/mK, fast response.
PIR/Phenolic insulation board
70-150mm typical depending on build regs U-value target.
Edge insulation strip
Critical around UFH zones to allow thermal expansion.
Pressure-testing kit
Pipes held at 6 bar through the pour to flag any damage immediately.
FAQs from Kilmington clients
What depth of screed over UFH pipes do you recommend?+
Minimum 50mm cover above the highest pipe — usually a 65-75mm total slab over insulation. Thicker if you want more thermal mass.
What if a pipe leaks during the pour?+
Pipes are held at 6 bar through the pour. Any pressure drop is flagged immediately and we stop, fix and continue — this is exactly why we keep the manifold under test.
Does liquid UFH screed improve EPC ratings?+
Indirectly — yes. Faster response and lower running temperatures help heat-pump COP, which feeds into your SAP/EPC. We'll share the manufacturer data your assessor needs.
Will the screed crack as the UFH heats up?+
Properly isolated at the edges and at doorway joints, no. We pour with the pipes pressure-tested and follow a controlled commissioning schedule.
When can I switch the underfloor heating on in Kilmington?+
On Cemfloor Therm we typically start a slow commissioning cycle from day 7, ramping 5°C per day per manufacturer spec. Forcing it earlier risks cracking, so we hold Kilmington clients to the schedule.
Why use liquid screed over UFH rather than sand-and-cement?+
Liquid screed flows around the pipes with no voids, giving 20-30% better thermal response and lower running costs than a hand-laid screed. That's why most Kilmington UFH installers recommend it.
Need Underfloor Heating Screed priced for Kilmington?
Tell us the square metres and access notes. Most Kilmington quotes go out the same day.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site