Underfloor Heating Screed · Devon
Stockland Underfloor Heating Screed Specialists
Underfloor heating only works as well as the screed encasing it — and in Stockland that means a high-thermal-conductivity liquid pour that wraps every pipe with no voids.
Talk to a Stockland-area screeder
We'll walk the build with you over a phone call — no hard sell, just honest numbers.
Call 07791 51084907791 510849 WhatsApp usGet a fixed price for Stockland Underfloor Heating Screed Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Underfloor heating only works as well as the screed encasing it — and in Stockland that means a high-thermal-conductivity liquid pour that wraps every pipe with no voids.
The screed self-levels around every loop, eliminating the voids you get under hand-laid traditional screed. That means the floor responds faster when the heating calls for it, and stores less wasted heat.
Most of our Stockland jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Stockland sits Honiton (5 mi), and we work the surrounding villages on the same week's diary.
Right fit for Stockland rural self-builders and farms
Stockland sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Local facts that shape every Stockland pour
County
Devon
District
East Devon
Postcode
EX14
Nearest city
Honiton (5 mi)
Nearest motorway
M5 (J28, ~14 mi)
Primary A-road
minor B-roads
Local industries
agriculture, cider
Common builds
Blackdown cob cottages, farm conversions
Underfloor Heating Screed in Stockland — how it works
We pour Cemfloor Therm liquid screed over your UFH pipes at 50mm above pipe (typically 65-75mm total over insulation), giving full pipe encapsulation, fast thermal response and a finished surface flat to SR1.
The screed self-levels around every loop, eliminating the voids you get under hand-laid traditional screed. That means the floor responds faster when the heating calls for it, and stores less wasted heat.
How a Stockland pour runs
- 1
UFH installer fits manifold, pipes and pressure-tests to 6 bar
- 2
We confirm edge insulation, DPM and pipe coverage depth
- 3
Pump and level the screed with pipes still under pressure
- 4
Slow commissioning of the heating — usually after 7 days, ramping per manufacturer spec
- 5
Floor coverings once moisture is signed off and commissioning is complete
Latest jobs across Devon



Specifications suited to Stockland builds
Cemfloor Therm
Liquid screed engineered for UFH — lambda 2.1 W/mK, fast response.
PIR/Phenolic insulation board
70-150mm typical depending on build regs U-value target.
Edge insulation strip
Critical around UFH zones to allow thermal expansion.
Pressure-testing kit
Pipes held at 6 bar through the pour to flag any damage immediately.
Other areas we cover near Stockland
Stockland screed questions, answered
Do you fit the UFH pipes yourself?+
We work alongside your chosen UFH installer rather than fitting pipes ourselves — most Stockland jobs come with a heating sub-contractor already lined up, and we coordinate dates with them.
What depth of screed over UFH pipes do you recommend?+
Minimum 50mm cover above the highest pipe — usually a 65-75mm total slab over insulation. Thicker if you want more thermal mass.
Will the screed crack as the UFH heats up?+
Properly isolated at the edges and at doorway joints, no. We pour with the pipes pressure-tested and follow a controlled commissioning schedule.
When can I switch the underfloor heating on in Stockland?+
On Cemfloor Therm we typically start a slow commissioning cycle from day 7, ramping 5°C per day per manufacturer spec. Forcing it earlier risks cracking, so we hold Stockland clients to the schedule.
What if a pipe leaks during the pour?+
Pipes are held at 6 bar through the pour. Any pressure drop is flagged immediately and we stop, fix and continue — this is exactly why we keep the manifold under test.
Does liquid UFH screed improve EPC ratings?+
Indirectly — yes. Faster response and lower running temperatures help heat-pump COP, which feeds into your SAP/EPC. We'll share the manufacturer data your assessor needs.
What backs our Stockland work
Talk to a Stockland-area screeder
We'll walk the build with you over a phone call — no hard sell, just honest numbers.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
