Liquid Screed · Devon

Liquid Screed — Dalwood, Devon

Across Dalwood we lay self-levelling Cemfloor screed at depths from 30mm, pumping straight off the truck and finishing to a true SR1 — no hand-trowelling, no cold joints.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Dalwood, Devon

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Across Dalwood we lay self-levelling Cemfloor screed at depths from 30mm, pumping straight off the truck and finishing to a true SR1 — no hand-trowelling, no cold joints.

Liquid screed bonds into a single monolithic layer with no bays, no day joints and no need for steel mesh — it's poured around any UFH pipework you've already pressure-tested.

Most of our Dalwood jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Dalwood sits Honiton (5 mi), and we work the surrounding villages on the same week's diary.

Liquid Screed in Dalwood — how it works

We pump Cemfloor calcium-sulphate screed from a static mixer into your building, level it with a dappling bar, and walk away with a floor that's typically dry enough for floor coverings in roughly one day per millimetre of depth.

The screed arrives ready-mixed on a truck, gets pumped through a hose to wherever it's needed in the building, and self-levels to within a couple of millimetres across the room. We spike-roll it to release air, then leave it.

EX13 access, routes and logistics

County

Devon

District

East Devon

Postcode

EX13

Nearest city

Honiton (5 mi)

Nearest motorway

M5 (J28, ~13 mi)

Primary A-road

minor B-roads

Local industries

heritage, agriculture

Common builds

Loughwood Meeting House precinct, cob cottages

What Dalwood builds usually need

  • Loughwood Meeting House precinct — a regular brief in Dalwood
  • Cob cottages — a regular brief in Dalwood
  • Small self-builds — a regular brief in Dalwood
  • Heritage — a regular brief in Dalwood
  • Agriculture — a regular brief in Dalwood

Latest jobs across Devon

Large open-plan pour for a new-build near Cullompton
Large open-plan pour for a new-build near Cullompton
Estuary-side residential retrofit in Topsham
Estuary-side residential retrofit in Topsham
Smooth finish on a garden room pour in Exmouth
Smooth finish on a garden room pour in Exmouth

Step-by-step for a Dalwood job

  1. 1

    Site visit and written quote — confirm depths, area, access, build-up

  2. 2

    We prep edge insulation, polythene DPM and any UFH coordination

  3. 3

    Pump day: ready-mixed screed pumped, levelled and spike-rolled in one pour

  4. 4

    Cover and protect for 24-48 hours

  5. 5

    Light foot traffic from day 2; floor coverings once moisture content is signed off

What backs our Dalwood work

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Dalwood-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Cemfloor systems for Dalwood

Cemfloor CT-C30-F6

Cement-based liquid screed — fast-drying, low shrinkage, suitable for most floor coverings.

Cemfloor Therm

Optimised for underfloor heating with high thermal conductivity.

Acoustic and thermal insulation underlay

PIR, EPS or acoustic mat depending on the build-up.

Edge isolation strip

10mm closed-cell foam to allow thermal movement.

Dalwood screed questions, answered

What depth do you lay to?+

30mm minimum bonded, 35-40mm unbonded, 50mm+ over UFH pipes. We'll spec the right depth for your Dalwood build-up.

Can you pour in cold weather?+

Yes, with the right ambient control. We won't pour below 5°C and we'll discuss frost protection for any Dalwood pour in the colder months.

How quickly can I walk on a liquid screed floor in Dalwood?+

Light foot traffic from 24-48 hours after the pour. Heavy loading, follow-on trades and final floor coverings depend on depth and ambient conditions — we leave you with clear drying guidance for your specific Dalwood job.

Can liquid screed go over an existing concrete slab?+

Yes — typically unbonded over a DPM and slip membrane, from 35mm. We'll assess the substrate at the Dalwood site visit.

Do I need to be on site for the pour in Dalwood?+

Not necessarily — we usually agree access with the main contractor or self-builder and run the pour with our own team. We'll confirm the Dalwood access route, pump position and waste route before the day.

Do you offer a guarantee?+

Yes — as a Cemfloor-certified installer, qualifying jobs are backed by a 10-year manufacturer-supported guarantee.

Book your Dalwood pour

Diary fills two to four weeks ahead. Pin a date now and we'll confirm logistics.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp