
Traditional Sand & Cement Screed · Devon
Traditional Sand & Cement Screed for Yarcombe Builds
Not every Yarcombe floor wants a pump on the driveway. A traditional sand and cement screed, hand-laid to bays and trowelled flat, still earns its place on deep fills, external thresholds and jobs where a wet-mix, robust finish matters more than speed.
Get a fixed price for Traditional Sand & Cement Screed for Yarcombe Builds
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Not every Yarcombe floor wants a pump on the driveway. A traditional sand and cement screed, hand-laid to bays and trowelled flat, still earns its place on deep fills, external thresholds and jobs where a wet-mix, robust finish matters more than speed.
Unlike a self-levelling liquid screed, sand and cement is placed and compacted by hand, so we control the fall towards a drain, form an upstand at a threshold, or feather it into an existing floor level in a way a pumped pour cannot.
Most of our Yarcombe jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Yarcombe sits Exeter (24 mi), and we work the surrounding villages on the same week's diary.
EX14 access, routes and logistics
County
Devon
District
East Devon
Postcode
EX14
Nearest city
Exeter (24 mi)
Nearest motorway
M5 (J28, ~16 mi)
Primary A-road
A30
Local industries
agriculture, equestrian yards
Common builds
stone farmhouses, barn conversions
What Yarcombe builds usually need
- Stone farmhouses — a regular brief in Yarcombe
- Barn conversions — a regular brief in Yarcombe
- Cottage extensions — a regular brief in Yarcombe
- Occasional new-build cottages — a regular brief in Yarcombe
- Agriculture — a regular brief in Yarcombe
Traditional Sand & Cement Screed in Yarcombe — how it works
For Yarcombe wet rooms, balconies and any area with sustained water contact, sand and cement is usually the only sensible screed choice, since gypsum-based liquid screeds are not designed to tolerate standing water.
We mix a semi-dry sand and cement screed on site or bring it in via a screed pump, lay it to string lines or laser-set pins in bays, then compact and trowel it to a flat, dense surface. It is slower than a liquid pour, roughly a day of drying time per millimetre of depth once you get past the first 50mm, but it tolerates a much wider range of site conditions.
Materials and systems we use in Yarcombe
Sand and cement (typically 4:1 or 5:1 mix)
Semi-dry, hand-compacted mix ratio adjusted to depth and loading.
SBR bonding agent
Slurry-brushed onto the substrate for bonded screeds under 40mm.
Polypropylene fibre reinforcement
Added to reduce shrinkage cracking on larger bays.
DPM and separating membrane
For unbonded or floating screeds over insulation.
Falls formed to drain outlets
Built into the screed thickness for wet rooms and balconies.
Edge and movement joints
Set at bay lines, doorways and around columns.
Floors poured around Yarcombe



Yarcombe-area service radius
Proof from the Devon workload
Common Yarcombe build questions
Is sand and cement cheaper than liquid screed?+
Materials cost less per square metre, but labour is higher because it is hand-placed rather than pumped. On smaller or awkward-access Yarcombe jobs the total cost is often similar.
Will the screed crack?+
Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Yarcombe job.
What SR rating do you achieve on a trowelled screed?+
We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.
How is sand and cement screed different from liquid screed in Yarcombe?+
Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.
Can you match an existing sand and cement floor level?+
Yes, we set datums off your existing finished floor level and build the new screed to match, allowing for whatever covering goes on top.
How long does a sand and cement screed take to dry in Yarcombe?+
Roughly a day per millimetre of depth once past the first 50mm, so a 65mm floor is typically ready for coverings in around six to eight weeks, depending on ventilation and site conditions.
From site visit to final trowel pass, our Yarcombe sand and cement jobs are quoted as one fixed price, with drying time explained up front so nobody is caught out.
Need a hand-trowelled screed in Yarcombe?
Tell us the depth, falls and access, and we'll come back with a fixed price for your Yarcombe sand and cement floor.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
