Suspended floors
Liquid Screed on Timber Floors
Screed on timber is done all the time — but the deck build-up and joist loading are the whole story.
Free quote · No obligation
Timber floor with UFH?
Name, phone, email — we'll reply the same working day with a fixed price.
Or call our landline on 01392 237700
Same-day reply
Fully insured
Written quote
You can pour liquid screed over timber. What makes it work is the deck detail below: acoustic layer, foil VCL, and a strong T&G board that won't deflect.
Joist loading needs a check from a structural engineer — 50mm of Cemfloor is ~110kg/m² and not every existing joist wants it.
Timber deck build-up (top-down)
- 50mm Cemfloor liquid screed with UFH
- Foil-faced VCL — taped joints
- 22mm P5 T&G chipboard or ply deck
- Acoustic overlay (e.g. 6mm sound-board)
- Existing joists (loading confirmed)
Residential liquid screed
- Level floors for extensions and self-builds
- Screed suitable for underfloor heating
- Build-up planned around your floor finish
Want a professional to handle it?
Related services
Covering Devon, Somerset and West Dorset
Frequently asked
Related guides
Timber floor with UFH?
Send the joist plan and SE report. We'll price the pour and the deck detail.
