For volume housebuilders

Liquid Screed for New-Build Housing Developers

We work to your build programme — booked plot-by-plot, poured before the roof is watertight, dry in time for first fix.

Developers don't need a sales pitch — they need pours that hit the programme without slipping the plaster, tiler or kitchen fitter behind them. That's what this page is about.

Every site we run for a housebuilder gets a named contact, a rolling plot schedule, and daily pour reports so the site manager knows what's dry, what's trafficable, and what's ready for follow-on trades.

How we run a developer site

  1. 1

    Plot schedule sign-off

    We take the build programme and lock pour dates against watertight-plus-UFH milestones for each plot.

  2. 2

    Pump-day logistics

    One pump can handle 6–10 plots a day. We batch by phase so the site isn't blocked.

  3. 3

    Daily dry-down reports

    Site manager gets a per-plot readiness update — trafficable, tile-ready, moisture-tested.

  4. 4

    Handover

    SR1 flatness signed off with a straight-edge log per plot for your QA file.

Programme numbers

6–10

Plots per pump-day

24–48h

Trafficable

7–14 days

Ready for tile

SR1 ±2mm

Flatness spec

What we need from you

  • Access for a 26t concrete pump within 40m of the pour
  • Insulation and UFH pressure-tested and signed off
  • Perimeter foam, DPM and edge detail in place
  • Water and 240V for the mix rig

Frequently asked

Booking a site programme?

Send the plot schedule and we'll come back with pour dates, per-plot pricing and a lead-time lock.