Liquid Screed for New-Build Housing Developers
We work to your build programme — booked plot-by-plot, poured before the roof is watertight, dry in time for first fix.
Developers don't need a sales pitch — they need pours that hit the programme without slipping the plaster, tiler or kitchen fitter behind them. That's what this page is about.
Every site we run for a housebuilder gets a named contact, a rolling plot schedule, and daily pour reports so the site manager knows what's dry, what's trafficable, and what's ready for follow-on trades.
How we run a developer site
- 1
Plot schedule sign-off
We take the build programme and lock pour dates against watertight-plus-UFH milestones for each plot.
- 2
Pump-day logistics
One pump can handle 6–10 plots a day. We batch by phase so the site isn't blocked.
- 3
Daily dry-down reports
Site manager gets a per-plot readiness update — trafficable, tile-ready, moisture-tested.
- 4
Handover
SR1 flatness signed off with a straight-edge log per plot for your QA file.
Programme numbers
6–10
Plots per pump-day
24–48h
Trafficable
7–14 days
Ready for tile
SR1 ±2mm
Flatness spec
What we need from you
- Access for a 26t concrete pump within 40m of the pour
- Insulation and UFH pressure-tested and signed off
- Perimeter foam, DPM and edge detail in place
- Water and 240V for the mix rig
Frequently asked
Booking a site programme?
Send the plot schedule and we'll come back with pour dates, per-plot pricing and a lead-time lock.