Dental fit-outs

Liquid Screed for Dental Practice Fit-Outs

Dental chairs bolt to a flat, level floor. If the substrate isn't right, every chair install goes over programme.

Dental fit-outs are unforgiving. The chair, the cabinetry and the welded vinyl all assume a substrate that's SR1 flat and moisture-tested.

We pour that substrate first time, so the chair installer isn't shimming and the flooring team isn't welding over lippage.

Fit-out sequence

  1. 1

    Strip out

    Existing floor lifted, slab prepared.

  2. 2

    Compliant build-up

    DPM, insulation if extending, service ducts formed.

  3. 3

    Pour

    Cemfloor to SR1, one day per surgery.

  4. 4

    Dry & test

    Force-dried, moisture test at 10 days.

  5. 5

    Hand off

    Flooring contractor lays welded vinyl over an SR1 substrate.

What we handle around dental spec

  • Cast-in floor boxes for compressor and suction lines
  • Falls to floor drains in decontam rooms
  • Chair-bolt zones cast dead flat to the bolt centres

Frequently asked

Fitting out surgeries?

Send the equipment plan and the chair bolt centres. We'll pour to spec around them.

Call now · 07765 712609