Liquid Screed for Dental Practice Fit-Outs

Dental chairs bolt to a flat, level floor. If the substrate isn't right, every chair install goes over programme.

Free quote · No obligation

Fitting out surgeries?

Name, phone, email — we'll reply the same working day with a fixed price.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Dental fit-outs are unforgiving. The chair, the cabinetry and the welded vinyl all assume a substrate that's SR1 flat and moisture-tested.

We pour that substrate first time, so the chair installer isn't shimming and the flooring team isn't welding over lippage.

Fit-out sequence

  1. 1

    Strip out

    Existing floor lifted, slab prepared.

  2. 2

    Compliant build-up

    DPM, insulation if extending, service ducts formed.

  3. 3

    Pour

    Cemfloor to SR1, one day per surgery.

  4. 4

    Dry & test

    Force-dried, moisture test at 10 days.

  5. 5

    Hand off

    Flooring contractor lays welded vinyl over an SR1 substrate.

What we handle around dental spec

  • Cast-in floor boxes for compressor and suction lines
  • Falls to floor drains in decontam rooms
  • Chair-bolt zones cast dead flat to the bolt centres

Frequently asked

Fitting out surgeries?

Send the equipment plan and the chair bolt centres. We'll pour to spec around them.