Liquid Screed for Dental Practice Fit-Outs
Dental chairs bolt to a flat, level floor. If the substrate isn't right, every chair install goes over programme.
Dental fit-outs are unforgiving. The chair, the cabinetry and the welded vinyl all assume a substrate that's SR1 flat and moisture-tested.
We pour that substrate first time, so the chair installer isn't shimming and the flooring team isn't welding over lippage.
Fit-out sequence
- 1
Strip out
Existing floor lifted, slab prepared.
- 2
Compliant build-up
DPM, insulation if extending, service ducts formed.
- 3
Pour
Cemfloor to SR1, one day per surgery.
- 4
Dry & test
Force-dried, moisture test at 10 days.
- 5
Hand off
Flooring contractor lays welded vinyl over an SR1 substrate.
What we handle around dental spec
- Cast-in floor boxes for compressor and suction lines
- Falls to floor drains in decontam rooms
- Chair-bolt zones cast dead flat to the bolt centres
Frequently asked
Fitting out surgeries?
Send the equipment plan and the chair bolt centres. We'll pour to spec around them.