Somerset
Underfloor heating screed in Somerset
Rural Somerset is moving to heat pumps, and a low-temperature system needs its pipes bedded in a screed that leaves no gaps. A flowing screed does that in a single pour.
Underfloor heating screed in Somerset
Send a few job details for a fixed price.
Or call our landline on 01392 237700
Heating Somerset's off-gas homes
Many villages on the Levels, around the Quantocks and Blackdowns and on the edge of Exmoor sit off the gas grid, relying on oil or electric heating. When those systems reach the end of their life, owners often turn to an air or ground source heat pump. A heat pump runs cooler than a boiler, so it relies on a large, evenly warmed floor, and that depends on the screed touching every pipe.
The kitchen-diner extension in Taunton pictured on our site is the classic Somerset brief: a new open-plan room at the back of the house, heated from the floor.
Insulation and soft ground
On the Levels, ground floors often sit on clay or peat and are built with generous insulation below. A screed floating on insulation needs at least 40mm of cover over the pipes, and most of these floors finish between 50 and 65mm. Perimeter strip around every wall lets the screed expand as it warms without cracking at the edges.
First heat and the programme
An anhydrite screed should not be heated for at least seven days after pouring, after which the temperature is brought up gradually to the manufacturer's schedule; some designers prefer to wait three weeks. Cement-based screeds dry more slowly, roughly a millimetre a day for the first 40mm. If you are counting on the new heating to move into an extension, build these weeks into the plan rather than discovering them afterwards.
Kitchen-diners and open-plan rooms
Somerset extensions are often one big room with bifold doors, a kitchen island and a dining area, and underfloor heating suits them because it frees the walls of radiators. Large glazed openings lose heat, so the heating designer may tighten the pipe spacing near the doors. We pour to whatever spacing is laid and check the cover above the closest runs as carefully as the rest.
Quoting a heated floor
Pipe cover sets the minimum depth, so the price follows the build-up drawing as much as the floor area. Mix choice, access and distance from Exeter complete the picture. Taunton has no travel surcharge; elsewhere in Somerset a small mobilisation figure is shown. The underfloor heating screed guide goes through depths, mixes and commissioning in detail.
Underfloor heating screed: Somerset coverage
We pour heated floors across Somerset, including in Trull, Staplegrove, Kingston St Mary, Wiveliscombe, Milverton, Dulverton, Williton, Nether Stowey, Cannington, Westonzoyland, Othery, Langport, Somerton, Martock, South Petherton, Taunton. Every place on the Somerset page
Underfloor heating screed in Somerset: questions
- Can the heat pump installer commission the floor straight after the pour?
- No. Anhydrite needs a minimum of seven days before first heat, and the warm-up follows the screed manufacturer's schedule. Agree the dates with your installer in advance.
- How deep will the screed be over my pipes?
- On insulation, at least 40mm above the pipe. Most Somerset extensions and new ground floors work out at 50 to 65mm overall.
- Do you pour heated floors outside Taunton?
- Yes, across Somerset. A small mobilisation fee applies beyond our regular area and is shown on the quote before you agree.
- Is anhydrite or cement-based screed better over heating pipes?
- Both work well. Anhydrite is common in dry living areas; a cement-based screed is the better choice in wet rooms or where water could reach the floor.
