Liquid screed pour near Lifton New Build Screeding Specialists

New Build Screeding · Devon

Lifton New Build Screeding Specialists

On multi-plot developments in Lifton we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Lifton New Build Screeding Specialists

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

On multi-plot developments in Lifton we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Lifton scheme, so plot 1 and plot 40 come out identical.

Most of our Lifton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Lifton sits Plymouth (25 mi), and we work the surrounding villages on the same week's diary.

What we plan around in Lifton

County

Devon

District

West Devon

Postcode

PL16

Nearest city

Plymouth (25 mi)

Nearest motorway

M5 (J31, ~34 mi)

Primary A-road

A30

Local industries

distribution, light manufacturing

Common builds

steel-frame units, warehouse floors

Where liquid screed earns its keep in Lifton

  • Steel-frame units — a regular brief in Lifton
  • Warehouse floors — a regular brief in Lifton
  • Trade-counter fit-outs — a regular brief in Lifton
  • Distribution sheds — a regular brief in Lifton
  • Distribution — a regular brief in Lifton

New Build Screeding in Lifton — how it works

Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Lifton site rather than a new quote for every unit.

Output on a typical Lifton plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.

Cemfloor systems for Lifton

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

Recent work near Lifton

Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth
Commercial pour at Heathfield, Newton Abbot
Commercial pour at Heathfield, Newton Abbot

Trust points for a Lifton brief

Hundreds of square metres poured around Lifton in the last 12 months

Single-team continuity — same crew, same standards, every job

Written fixed-price quotes — no day-rate creep

Moisture-test handover record so flooring contractors take the slab on without dispute

FAQs from Lifton clients

How many plots can you screed per day on a Lifton development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

Do you provide RAMS for a new build site in Lifton?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

Can you keep the same build-up across every plot?+

Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Lifton site come out to the same depth and finish.

Can you scale up if the Lifton programme accelerates?+

Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.

Do you price the whole Lifton site or plot by plot?+

Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.

New build screeding in Lifton comes down to one thing above all else, keeping the programme moving, get the plot sequence and pump access right and every trade behind you stays on track.

Multi-plot pours across PL16

From a handful of units to a full Lifton phase, we plan crew and pump around your build programme, not ours.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp