
Devon Coverage
Laser-Flat Screed Floors Across Lifton
From Tinhay to Lifton Business Park, we run residential and commercial liquid screed pours with a small dedicated team.
From Tinhay to Lifton Business Park, we run residential and commercial liquid screed pours with a small dedicated team.
We're Lifton is a working West Devon village where big food-processing pours and estate cottages both need our attention. Our coverage runs across PL16, taking in Tinhay and out toward Lifton Business Park, with the M5 (J31, ~34 mi) on hand for materials and pump trucks.
Most of our Lifton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Lifton sits Plymouth (25 mi), and we work the surrounding villages on the same week's diary.
What we plan around in Lifton
County
Devon
District
West Devon
Postcode
PL16
Nearest city
Plymouth (25 mi)
Nearest motorway
M5 (J31, ~34 mi)
Primary A-road
A30
Local industries
distribution, light manufacturing
Common builds
steel-frame units, warehouse floors
Where liquid screed earns its keep in Lifton
- Steel-frame units — a regular brief in Lifton
- Warehouse floors — a regular brief in Lifton
- Trade-counter fit-outs — a regular brief in Lifton
- Distribution sheds — a regular brief in Lifton
- Distribution — a regular brief in Lifton
Liquid screed in Lifton — how it works
On larger Lifton jobs we mobilise a static mixer; on residential we use ready-mix delivery and a smaller pump. Either way, the finished floor reads the same.
We pour Cemfloor liquid screed at SR1 flatness, pumping straight off the truck into the building. No hand-trowelled bays, no cold joints, ready for trades back on the floor in 48 hours.
Materials and systems we use in Lifton
Cemfloor CT-C30-F6
Cement-based liquid screed — robust, low-shrinkage, fast-drying.
Cemfloor Therm
Thermally-optimised for UFH.
PIR insulation + DPM
Build-up tuned to your build regs U-value.
Latest jobs across Devon



Adjacent areas — usually same-week diary
What backs our Lifton work
Hundreds of square metres poured around Lifton in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Lifton screed questions, answered
Can you screed over an existing concrete slab?+
Usually yes — from 30mm bonded if the slab is sound. We'll inspect the substrate at the Lifton site visit.
How long does the floor take to dry in Lifton?+
Roughly one day per millimetre of depth, ambient conditions allowing. We'll give you specific guidance for your Lifton pour.
Do you handle UFH coordination?+
Yes — we work with whichever UFH installer is on your Lifton project and align dates with their pressure-test schedule.
Do you offer a guarantee?+
As a Cemfloor-certified installer, qualifying installs are backed by a 10-year manufacturer-supported guarantee.
Do you cover Lifton?+
Yes — Lifton sits inside our regular 30-mile working radius and we have active diary there most months.
Can you give a fixed-price quote?+
Yes — every Lifton quote is a written fixed price against a defined scope. No day-rate surprises.
Whether it's a steel-frame units in Lifton or a commercial fit-out at Lifton Business Park, the answer is the same — one pour, laser-flat, ready for trades back on the floor in 48 hours.
Cemfloor screed across PL16
From Lifton to the surrounding villages, one team, one fixed price.
