
Underfloor Heating Screed · Devon
Lifton Underfloor Heating Screed Specialists
Across Lifton we work hand-in-hand with UFH installers — they lay and pressure-test the pipes, we pour around them the next day at the right depth and thermal performance.
Get a fixed price for Lifton Underfloor Heating Screed Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Across Lifton we work hand-in-hand with UFH installers — they lay and pressure-test the pipes, we pour around them the next day at the right depth and thermal performance.
Liquid UFH screed lets you run a thinner build-up than traditional bays — useful when ceiling heights or threshold levels are tight in Lifton renovations.
Most of our Lifton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Lifton sits Plymouth (25 mi), and we work the surrounding villages on the same week's diary.
Why Lifton site context matters
County
Devon
District
West Devon
Postcode
PL16
Nearest city
Plymouth (25 mi)
Nearest motorway
M5 (J31, ~34 mi)
Primary A-road
A30
Local industries
distribution, light manufacturing
Common builds
steel-frame units, warehouse floors
Lifton projects we see most
- Steel-frame units — a regular brief in Lifton
- Warehouse floors — a regular brief in Lifton
- Trade-counter fit-outs — a regular brief in Lifton
- Distribution sheds — a regular brief in Lifton
- Distribution — a regular brief in Lifton
Underfloor Heating Screed in Lifton — how it works
Liquid UFH screed lets you run a thinner build-up than traditional bays — useful when ceiling heights or threshold levels are tight in Lifton renovations.
We pour Cemfloor Therm liquid screed over your UFH pipes at 50mm above pipe (typically 65-75mm total over insulation), giving full pipe encapsulation, fast thermal response and a finished surface flat to SR1.
Materials and systems we use in Lifton
Cemfloor Therm
Liquid screed engineered for UFH — lambda 2.1 W/mK, fast response.
PIR/Phenolic insulation board
70-150mm typical depending on build regs U-value target.
Edge insulation strip
Critical around UFH zones to allow thermal expansion.
Pressure-testing kit
Pipes held at 6 bar through the pour to flag any damage immediately.
Floors poured around Lifton



Nearby villages and towns
Proof from the Devon workload
Hundreds of square metres poured around Lifton in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Common Lifton build questions
What depth of screed over UFH pipes do you recommend?+
Minimum 50mm cover above the highest pipe — usually a 65-75mm total slab over insulation. Thicker if you want more thermal mass.
Will the screed crack as the UFH heats up?+
Properly isolated at the edges and at doorway joints, no. We pour with the pipes pressure-tested and follow a controlled commissioning schedule.
Does liquid UFH screed improve EPC ratings?+
Indirectly — yes. Faster response and lower running temperatures help heat-pump COP, which feeds into your SAP/EPC. We'll share the manufacturer data your assessor needs.
What if a pipe leaks during the pour?+
Pipes are held at 6 bar through the pour. Any pressure drop is flagged immediately and we stop, fix and continue — this is exactly why we keep the manifold under test.
When can I switch the underfloor heating on in Lifton?+
On Cemfloor Therm we typically start a slow commissioning cycle from day 7, ramping 5°C per day per manufacturer spec. Forcing it earlier risks cracking, so we hold Lifton clients to the schedule.
Why use liquid screed over UFH rather than sand-and-cement?+
Liquid screed flows around the pipes with no voids, giving 20-30% better thermal response and lower running costs than a hand-laid screed. That's why most Lifton UFH installers recommend it.
From the first site visit to the final laitance sand, our Lifton jobs are run as one fixed-price piece of work — no creeping extras.
Talk to a Lifton-area screeder
We'll walk the build with you over a phone call — no hard sell, just honest numbers.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
