New Build Screeding · Devon
New Build Screeding — Holsworthy, Devon
Developers building across Holsworthy need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Book your Holsworthy development into the diary
Multi-plot schemes need booking well ahead. Reserve your Holsworthy pour dates now and we'll confirm logistics with your site manager.
Reserve dates07791 510849 WhatsApp usGet a fixed price for New Build Screeding — Holsworthy, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Developers building across Holsworthy need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Output on a typical Holsworthy plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
Most of our Holsworthy jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Holsworthy sits Exeter (38 mi), and we work the surrounding villages on the same week's diary.
Who this is for in Holsworthy
Holsworthy sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Local facts that shape every Holsworthy pour
County
Devon
District
Torridge
Postcode
EX22
Nearest city
Exeter (38 mi)
Nearest motorway
M5 (J27, ~50 mi)
Primary A-road
A3072
Local industries
cattle market, agriculture
Common builds
stone terraces, new estates off Western Road
New Build Screeding in Holsworthy — how it works
Output on a typical Holsworthy plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Holsworthy scheme, so plot 1 and plot 40 come out identical.
What to expect on pour day in Holsworthy
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Holsworthy-area projects



Materials and systems we use in Holsworthy
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Other areas we cover near Holsworthy
What people in Holsworthy usually ask
Do you price the whole Holsworthy site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you provide RAMS for a new build site in Holsworthy?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How many plots can you screed per day on a Holsworthy development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Can you scale up if the Holsworthy programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Holsworthy site come out to the same depth and finish.
Why Holsworthy clients pick us
Book your Holsworthy development into the diary
Multi-plot schemes need booking well ahead. Reserve your Holsworthy pour dates now and we'll confirm logistics with your site manager.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
