
New Build Screeding · Devon
New Build Screeding in Yelverton
On multi-plot developments in Yelverton we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
Get a fixed price for New Build Screeding in Yelverton
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
On multi-plot developments in Yelverton we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Yelverton scheme, so plot 1 and plot 40 come out identical.
Most of our Yelverton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Yelverton sits Plymouth (10 mi), and we work the surrounding villages on the same week's diary.
What we plan around in Yelverton
County
Devon
District
West Devon
Postcode
PL20
Nearest city
Plymouth (10 mi)
Nearest motorway
M5 (J31, ~38 mi)
Primary A-road
A386
Local industries
commuter, Dartmoor tourism
Common builds
Dartmoor-edge bungalows, small new estates
Where liquid screed earns its keep in Yelverton
- Dartmoor-edge bungalows — a regular brief in Yelverton
- Small new estates — a regular brief in Yelverton
- RAF-era buildings — a regular brief in Yelverton
- Commuter — a regular brief in Yelverton
- Dartmoor tourism — a regular brief in Yelverton
New Build Screeding in Yelverton — how it works
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Yelverton scheme, so plot 1 and plot 40 come out identical.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Yelverton development moves through screed without a gap in the build sequence.
Materials and systems we use in Yelverton
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Floors poured around Yelverton



Adjacent areas — usually same-week diary
Proof from the Devon workload
Hundreds of square metres poured around Yelverton in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Common Yelverton build questions
Are you set up for NHBC or LABC warranty requirements?+
Yes, our build-ups and documentation are prepared to match whichever warranty provider your Yelverton development is registered with.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
How many plots can you screed per day on a Yelverton development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Do you provide RAMS for a new build site in Yelverton?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
Can you scale up if the Yelverton programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Do you price the whole Yelverton site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
New build screeding in Yelverton comes down to one thing above all else, keeping the programme moving, get the plot sequence and pump access right and every trade behind you stays on track.
Multi-plot pours across PL20
From a handful of units to a full Yelverton phase, we plan crew and pump around your build programme, not ours.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
