New Build Screeding · Devon
New Build Screeding — Modbury, Devon
Modbury new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.
Book your Modbury development into the diary
Multi-plot schemes need booking well ahead. Reserve your Modbury pour dates now and we'll confirm logistics with your site manager.
Reserve dates07791 510849 WhatsApp usGet a fixed price for New Build Screeding — Modbury, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Modbury new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Modbury development moves through screed without a gap in the build sequence.
Most of our Modbury jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Modbury sits Plymouth (12 mi), and we work the surrounding villages on the same week's diary.
Who this is for in Modbury
Modbury sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Why Modbury site context matters
County
Devon
District
South Hams
Postcode
PL21
Nearest city
Plymouth (12 mi)
Nearest motorway
M5 (J31, ~37 mi)
Primary A-road
A379
Local industries
independent retail, agriculture
Common builds
Georgian high-street, small new estates
New Build Screeding in Modbury — how it works
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Modbury scheme, so plot 1 and plot 40 come out identical.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Modbury development moves through screed without a gap in the build sequence.
What to expect on pour day in Modbury
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Floors poured around Modbury



Materials and systems we use in Modbury
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Nearby villages and towns
Common Modbury build questions
Are you set up for NHBC or LABC warranty requirements?+
Yes, our build-ups and documentation are prepared to match whichever warranty provider your Modbury development is registered with.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you provide RAMS for a new build site in Modbury?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How many plots can you screed per day on a Modbury development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Can you scale up if the Modbury programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Do you price the whole Modbury site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Proof from the Devon workload
- 01Cemfloor-certified, fully insured, CDM-aware
- 02Coordinated with most South West UFH installers
- 03Pre-start meeting standard on every commercial job
- 04Local knowledge — we know the M5 (J31, ~37 mi) access window and A379 traffic patterns
Book your Modbury development into the diary
Multi-plot schemes need booking well ahead. Reserve your Modbury pour dates now and we'll confirm logistics with your site manager.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
