New Build Screeding · Devon

New Build Screeding in Totnes

On multi-plot developments in Totnes we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

Liquid screed work near New Build Screeding in Totnes
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for New Build Screeding in Totnes

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

On multi-plot developments in Totnes we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Totnes scheme, so plot 1 and plot 40 come out identical.

Most of our Totnes jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Totnes sits Exeter (25 mi), and we work the surrounding villages on the same week's diary.

Typical Totnes use cases

  • Medieval high-street stock — a regular brief in Totnes
  • Eco self-builds — a regular brief in Totnes
  • Barn conversions — a regular brief in Totnes
  • Independent retail — a regular brief in Totnes
  • Creative industries — a regular brief in Totnes

Who this is for in Totnes

Totnes sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.

New Build Screeding in Totnes — how it works

Output on a typical Totnes plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.

New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Totnes scheme, so plot 1 and plot 40 come out identical.

Materials and systems we use in Totnes

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

What to expect on pour day in Totnes

  1. 1

    Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates

  2. 2

    Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot

  3. 3

    Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn

  4. 4

    Protect each plot for 24-48 hours while the crew moves on to the next

  5. 5

    Moisture testing and a written handover record issued per plot

  6. 6

    Snagging and any remedial work coordinated directly with the site manager before final trades move in

Totnes-area projects

Garage floor refinished in Torquay
Garage floor refinished in Torquay
Commercial pour at Heathfield, Newton Abbot
Commercial pour at Heathfield, Newton Abbot
UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth

Why Totnes clients pick us

Hundreds of square metres poured around Totnes in the last 12 months

Single-team continuity — same crew, same standards, every job

Written fixed-price quotes — no day-rate creep

Moisture-test handover record so flooring contractors take the slab on without dispute

What people in Totnes usually ask

Do you price the whole Totnes site or plot by plot?+

Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

How many plots can you screed per day on a Totnes development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

Do you provide RAMS for a new build site in Totnes?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

Can you keep the same build-up across every plot?+

Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Totnes site come out to the same depth and finish.

Can you scale up if the Totnes programme accelerates?+

Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.

Multi-plot pours across TQ9

From a handful of units to a full Totnes phase, we plan crew and pump around your build programme, not ours.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp