New Build Screeding · Devon
Colaton Raleigh New Build Screeding Specialists
On multi-plot developments in Colaton Raleigh we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
Screeding a new build site in Colaton Raleigh?
Send us the plot count, floor areas and target handover dates, and we'll come back with a development-wide fixed price.
Get a Colaton Raleigh programme quote07791 510849 WhatsApp usGet a fixed price for Colaton Raleigh New Build Screeding Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
On multi-plot developments in Colaton Raleigh we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Colaton Raleigh scheme, so plot 1 and plot 40 come out identical.
Most of our Colaton Raleigh jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Colaton Raleigh sits Exeter (12 mi), and we work the surrounding villages on the same week's diary.
Right fit for Colaton Raleigh rural self-builders and farms
Colaton Raleigh sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Colaton Raleigh at a glance
County
Devon
District
East Devon
Postcode
EX10
Nearest city
Exeter (12 mi)
Nearest motorway
M5 (J30, ~10 mi)
Primary A-road
B3178
Local industries
agriculture, commuter
Common builds
cob cottages, small new estates
New Build Screeding in Colaton Raleigh — how it works
Output on a typical Colaton Raleigh plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Colaton Raleigh scheme, so plot 1 and plot 40 come out identical.
How a Colaton Raleigh pour runs
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Colaton Raleigh-area projects



Specifications suited to Colaton Raleigh builds
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Within easy reach of Colaton Raleigh
What people in Colaton Raleigh usually ask
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Colaton Raleigh site come out to the same depth and finish.
How many plots can you screed per day on a Colaton Raleigh development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Do you provide RAMS for a new build site in Colaton Raleigh?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Can you scale up if the Colaton Raleigh programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Do you price the whole Colaton Raleigh site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Why Colaton Raleigh clients pick us
Hundreds of square metres poured around Colaton Raleigh in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Screeding a new build site in Colaton Raleigh?
Send us the plot count, floor areas and target handover dates, and we'll come back with a development-wide fixed price.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site