New Build Screeding · Devon
New Build Screeding in Newton Poppleford
On multi-plot developments in Newton Poppleford we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
Get a fixed price for New Build Screeding in Newton Poppleford
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
On multi-plot developments in Newton Poppleford we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Newton Poppleford scheme, so plot 1 and plot 40 come out identical.
Most of our Newton Poppleford jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Newton Poppleford sits Exeter (12 mi), and we work the surrounding villages on the same week's diary.
New Build Screeding in Newton Poppleford — how it works
Output on a typical Newton Poppleford plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Newton Poppleford scheme, so plot 1 and plot 40 come out identical.
What we plan around in Newton Poppleford
County
Devon
District
East Devon
Postcode
EX10
Nearest city
Exeter (12 mi)
Nearest motorway
M5 (J30, ~10 mi)
Primary A-road
A3052
Local industries
commuter, agriculture
Common builds
cob cottages, modern bungalows
Where liquid screed earns its keep in Newton Poppleford
- Cob cottages — a regular brief in Newton Poppleford
- Modern bungalows — a regular brief in Newton Poppleford
- Small workshops — a regular brief in Newton Poppleford
- Commuter — a regular brief in Newton Poppleford
- Agriculture — a regular brief in Newton Poppleford
Newton Poppleford-area projects



What to expect on pour day in Newton Poppleford
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Why Newton Poppleford clients pick us
Hundreds of square metres poured around Newton Poppleford in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Adjacent areas — usually same-week diary
Materials and systems we use in Newton Poppleford
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
What people in Newton Poppleford usually ask
Do you price the whole Newton Poppleford site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Do you provide RAMS for a new build site in Newton Poppleford?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How many plots can you screed per day on a Newton Poppleford development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Newton Poppleford site come out to the same depth and finish.
Can you scale up if the Newton Poppleford programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Multi-plot pours across EX10
From a handful of units to a full Newton Poppleford phase, we plan crew and pump around your build programme, not ours.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700