Traditional Sand & Cement Screed · Devon
Traditional Sand & Cement Screed in Newton Poppleford
For Newton Poppleford jobs where gypsum-based screed is ruled out, wet rooms, balconies, timber-sensitive junctions, we lay a semi-dry sand and cement mix, bay by bay, finished to SR2 with a hand float or power trowel.
Get a fixed price for Traditional Sand & Cement Screed in Newton Poppleford
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
For Newton Poppleford jobs where gypsum-based screed is ruled out, wet rooms, balconies, timber-sensitive junctions, we lay a semi-dry sand and cement mix, bay by bay, finished to SR2 with a hand float or power trowel.
For Newton Poppleford wet rooms, balconies and any area with sustained water contact, sand and cement is usually the only sensible screed choice, since gypsum-based liquid screeds are not designed to tolerate standing water.
Most of our Newton Poppleford jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Newton Poppleford sits Exeter (12 mi), and we work the surrounding villages on the same week's diary.
Traditional Sand & Cement Screed in Newton Poppleford — how it works
We mix a semi-dry sand and cement screed on site or bring it in via a screed pump, lay it to string lines or laser-set pins in bays, then compact and trowel it to a flat, dense surface. It is slower than a liquid pour, roughly a day of drying time per millimetre of depth once you get past the first 50mm, but it tolerates a much wider range of site conditions.
Unlike a self-levelling liquid screed, sand and cement is placed and compacted by hand, so we control the fall towards a drain, form an upstand at a threshold, or feather it into an existing floor level in a way a pumped pour cannot.
Local facts that shape every Newton Poppleford pour
County
Devon
District
East Devon
Postcode
EX10
Nearest city
Exeter (12 mi)
Nearest motorway
M5 (J30, ~10 mi)
Primary A-road
A3052
Local industries
commuter, agriculture
Common builds
cob cottages, modern bungalows
Common briefs across Newton Poppleford
- Cob cottages — a regular brief in Newton Poppleford
- Modern bungalows — a regular brief in Newton Poppleford
- Small workshops — a regular brief in Newton Poppleford
- Commuter — a regular brief in Newton Poppleford
- Agriculture — a regular brief in Newton Poppleford
Latest jobs across Devon



What to expect on pour day in Newton Poppleford
- 1
Site visit to assess substrate, falls, depth and access, since sand and cement can be barrowed where a pump truck cannot reach
- 2
Substrate prep, priming or DPM, and setting out of bay lines and laser levels
- 3
Mix and place the screed in bays, compacting as we go to remove voids
- 4
Hand float or power trowel to a flat, dense SR2 finish
- 5
Protect and allow to cure, typically a day per millimetre of depth after the first 50mm
- 6
Follow-up inspection before floor coverings or tiling begin
What backs our Newton Poppleford work
Hundreds of square metres poured around Newton Poppleford in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Other areas we cover near Newton Poppleford
Materials and systems we use in Newton Poppleford
Sand and cement (typically 4:1 or 5:1 mix)
Semi-dry, hand-compacted mix ratio adjusted to depth and loading.
SBR bonding agent
Slurry-brushed onto the substrate for bonded screeds under 40mm.
Polypropylene fibre reinforcement
Added to reduce shrinkage cracking on larger bays.
DPM and separating membrane
For unbonded or floating screeds over insulation.
Falls formed to drain outlets
Built into the screed thickness for wet rooms and balconies.
Edge and movement joints
Set at bay lines, doorways and around columns.
Newton Poppleford screed questions, answered
What thickness do you lay for a bonded sand and cement screed?+
Bonded screeds go down from 25mm minimum, unbonded or floating builds from 50mm, and thicker still where we are making up a significant fall or a dug-out sub-base.
How is sand and cement screed different from liquid screed in Newton Poppleford?+
Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.
Will the screed crack?+
Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Newton Poppleford job.
What SR rating do you achieve on a trowelled screed?+
We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.
How long does a sand and cement screed take to dry in Newton Poppleford?+
Roughly a day per millimetre of depth once past the first 50mm, so a 65mm floor is typically ready for coverings in around six to eight weeks, depending on ventilation and site conditions.
Can you match an existing sand and cement floor level?+
Yes, we set datums off your existing finished floor level and build the new screed to match, allowing for whatever covering goes on top.
Talk through your Newton Poppleford sand and cement job
No pump access, an awkward fall, or a wet area, call and we'll talk through the right build-up for your Newton Poppleford floor.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
