Liquid Screed · Devon
Liquid Screed in Newton Poppleford
Newton Poppleford builders pick liquid screed because it pours fast, dries faster and leaves a floor that tile and engineered timber actually want to bond to.
Get a fixed price for Newton Poppleford
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Newton Poppleford builders pick liquid screed because it pours fast, dries faster and leaves a floor that tile and engineered timber actually want to bond to.
Unlike a traditional sand-and-cement screed, you'll be back on the floor in 24-48 hours rather than a week, and the surface is flat enough to lay LVT or large-format tile without further latex.
Most of our Newton Poppleford jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Newton Poppleford sits Exeter (12 mi), and we work the surrounding villages on the same week's diary.
Liquid Screed in Newton Poppleford — how it works
Unlike a traditional sand-and-cement screed, you'll be back on the floor in 24-48 hours rather than a week, and the surface is flat enough to lay LVT or large-format tile without further latex.
We pump Cemfloor calcium-sulphate screed from a static mixer into your building, level it with a dappling bar, and walk away with a floor that's typically dry enough for floor coverings in roughly one day per millimetre of depth.
Why Newton Poppleford site context matters
County
Devon
District
East Devon
Postcode
EX10
Nearest city
Exeter (12 mi)
Nearest motorway
M5 (J30, ~10 mi)
Primary A-road
A3052
Local industries
commuter, agriculture
Common builds
cob cottages, modern bungalows
Newton Poppleford projects we see most
- Cob cottages — a regular brief in Newton Poppleford
- Modern bungalows — a regular brief in Newton Poppleford
- Small workshops — a regular brief in Newton Poppleford
- Commuter — a regular brief in Newton Poppleford
- Agriculture — a regular brief in Newton Poppleford
Floors poured around Newton Poppleford



Step-by-step for a Newton Poppleford job
- 1
Site visit and written quote — confirm depths, area, access, build-up
- 2
We prep edge insulation, polythene DPM and any UFH coordination
- 3
Pump day: ready-mixed screed pumped, levelled and spike-rolled in one pour
- 4
Cover and protect for 24-48 hours
- 5
Light foot traffic from day 2; floor coverings once moisture content is signed off
Proof from the Devon workload
Hundreds of square metres poured around Newton Poppleford in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Nearby villages and towns
Cemfloor systems for Newton Poppleford
Cemfloor CT-C30-F6
Cement-based liquid screed — fast-drying, low shrinkage, suitable for most floor coverings.
Cemfloor Therm
Optimised for underfloor heating with high thermal conductivity.
Acoustic and thermal insulation underlay
PIR, EPS or acoustic mat depending on the build-up.
Edge isolation strip
10mm closed-cell foam to allow thermal movement.
Common Newton Poppleford build questions
Do you sand the floor afterwards?+
On calcium-sulphate screeds we sand off the surface laitance roughly 5-7 days after the pour, before any floor coverings go down.
How quickly can I walk on a liquid screed floor in Newton Poppleford?+
Light foot traffic from 24-48 hours after the pour. Heavy loading, follow-on trades and final floor coverings depend on depth and ambient conditions — we leave you with clear drying guidance for your specific Newton Poppleford job.
Can you pour in cold weather?+
Yes, with the right ambient control. We won't pour below 5°C and we'll discuss frost protection for any Newton Poppleford pour in the colder months.
Can liquid screed go over an existing concrete slab?+
Yes — typically unbonded over a DPM and slip membrane, from 35mm. We'll assess the substrate at the Newton Poppleford site visit.
Do you offer a guarantee?+
Yes — as a Cemfloor-certified installer, qualifying jobs are backed by a 10-year manufacturer-supported guarantee.
Does liquid screed crack like sand-and-cement?+
Calcium-sulphate and modern cement-based liquid screeds have very low drying shrinkage. With proper edge isolation and joints at doorways, cracking is rare.
Talk to a Newton Poppleford-area screeder
We'll walk the build with you over a phone call — no hard sell, just honest numbers.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
