New Build Screeding · Devon
New Build Screeding Poured to SR1 in Budleigh Salterton
Developers building across Budleigh Salterton need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.

Get a fixed price for New Build Screeding Poured to SR1 in Budleigh Salterton
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Developers building across Budleigh Salterton need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Output on a typical Budleigh Salterton plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
Most of our Budleigh Salterton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Budleigh Salterton sits Exeter (13 mi), and we work the surrounding villages on the same week's diary.
Budleigh Salterton projects we see most
- Seafront villas — a regular brief in Budleigh Salterton
- Retirement flats — a regular brief in Budleigh Salterton
- Historic high-street — a regular brief in Budleigh Salterton
- Retirement living — a regular brief in Budleigh Salterton
- Jurassic Coast tourism — a regular brief in Budleigh Salterton
Right fit for Budleigh Salterton coastal residential and hospitality clients
Budleigh Salterton is a coastal town, so damp control, salt exposure and tight winter pour windows shape every brief. We work the diary around that — and around the holiday-let turnover that funds half the jobs here.
New Build Screeding in Budleigh Salterton — how it works
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Budleigh Salterton development moves through screed without a gap in the build sequence.
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Budleigh Salterton site rather than a new quote for every unit.
Specifications suited to Budleigh Salterton builds
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
How a Budleigh Salterton pour runs
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Latest jobs across Devon



Nearby villages and towns
What backs our Budleigh Salterton work
Budleigh Salterton screed questions, answered
Do you offer a guarantee on new build plots?+
Yes, as a Cemfloor-certified installer, qualifying plots are backed by the manufacturer's 10-year guarantee, issued per unit as part of the handover pack.
Do you provide RAMS for a new build site in Budleigh Salterton?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
How many plots can you screed per day on a Budleigh Salterton development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Can you scale up if the Budleigh Salterton programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Budleigh Salterton site come out to the same depth and finish.
Cemfloor-certified plot screeding near Budleigh Salterton
Manufacturer-backed installs, per-plot moisture records and a ten-year guarantee on qualifying units.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
