New Build Screeding · Devon
Woodbury Salterton New Build Screeding Specialists
New build sites in Woodbury Salterton run to a programme, not a wish list, and screed is usually the trade holding up everything behind it. We sequence plot by plot so your follow-on trades never sit idle.
Get a fixed price for Woodbury Salterton New Build Screeding Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
New build sites in Woodbury Salterton run to a programme, not a wish list, and screed is usually the trade holding up everything behind it. We sequence plot by plot so your follow-on trades never sit idle.
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Woodbury Salterton site rather than a new quote for every unit.
Most of our Woodbury Salterton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Woodbury Salterton sits Exeter (7 mi), and we work the surrounding villages on the same week's diary.
New Build Screeding in Woodbury Salterton — how it works
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Woodbury Salterton site rather than a new quote for every unit.
Output on a typical Woodbury Salterton plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
What we plan around in Woodbury Salterton
County
Devon
District
East Devon
Postcode
EX5
Nearest city
Exeter (7 mi)
Nearest motorway
M5 (J30, ~5 mi)
Primary A-road
B3179
Local industries
agriculture, equestrian yards
Common builds
stone farmhouses, barn conversions
Where liquid screed earns its keep in Woodbury Salterton
- Stone farmhouses — a regular brief in Woodbury Salterton
- Barn conversions — a regular brief in Woodbury Salterton
- Cottage extensions — a regular brief in Woodbury Salterton
- Occasional new-build cottages — a regular brief in Woodbury Salterton
- Agriculture — a regular brief in Woodbury Salterton
Recent work near Woodbury Salterton



Step-by-step for a Woodbury Salterton job
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Trust points for a Woodbury Salterton brief
Adjacent areas — usually same-week diary
Cemfloor systems for Woodbury Salterton
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
FAQs from Woodbury Salterton clients
How many plots can you screed per day on a Woodbury Salterton development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you provide RAMS for a new build site in Woodbury Salterton?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Woodbury Salterton site come out to the same depth and finish.
Do you price the whole Woodbury Salterton site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Can you scale up if the Woodbury Salterton programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Coordinate UFH and screed across your Woodbury Salterton plots
One agreed build-up, repeated consistently on every unit, with pressure-testing coordinated plot by plot.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
