Levelling uneven floors

Floor Levelling with Self-Levelling Screed

When an old slab dips, rolls or steps between rooms, a self-levelling screed poured over it gives you one flat floor to lay tiles, timber or vinyl on.

Free quote · No obligation

Get an uneven floor levelled

Name, phone, email — we'll reply the same working day with a fixed price.

Call mobile

No obligation · Same-day reply

Or call our landline on 01392 237700

Same-day reply
Fully insured
Written quote

Floor levelling is about getting a flat, even surface before the finished flooring goes down. Tiles crack over a hump, LVT telegraphs every dip, and engineered boards rock where the floor falls away. The fix depends on how far out the floor is.

For corrections measured in tens of millimetres, a self-levelling screed is the right tool. Liquid screed is pumped in, finds its own level and sets as one continuous layer, so levelling a concrete floor across a whole ground floor is done in a single visit rather than room by room.

For very small corrections of a few millimetres, floor layers usually use a latex or self-levelling compound instead. This page explains where each one fits, so you know which to ask for.

Floor levelling screed vs floor levelling compound

Self-levelling screed

  • Laid at screed depths — from 25mm (Gyvlon Screed bonded) or 30mm (Cemfloor bonded), 35–40mm unbonded
  • Pumped over a whole floor in one pour
  • Can be laid over insulation and underfloor heating pipes
  • Suits large dips, steps between rooms and full ground-floor renovations

Latex or self-levelling compound

  • A thin smoothing layer, usually a few millimetres
  • Mixed in buckets and spread by hand or with a pin roller
  • Used by floor layers just before vinyl, LVT or carpet
  • Not designed to bridge deep dips or encase heating pipes

When a self-levelling screed is the right answer

If the floor is out by more than a compound can take, or you want to add insulation or underfloor heating while you are at it, a new screed over the old floor makes sense. On a sound slab the screed can be bonded; where the old floor is contaminated, damp-proofed or partly broken up, it is laid unbonded over a membrane at a slightly greater depth.

Liquid screed self-levels across the room and is finished to a flatness class agreed for the covering, so the floor layer starts from a true surface. Our renovation screed guide covers the older-house build-ups in more detail, and floor preparation explains what we check underneath first.

Levelling a concrete floor, step by step

  1. 1

    Survey the floor

    We check levels across the rooms, thresholds and door heights, and how sound the existing slab is.

  2. 2

    Choose bonded or unbonded

    Sound, clean slabs can be primed and bonded; others get a membrane and an unbonded screed.

  3. 3

    Set the datum

    Levels are set to the finished floor height you need, with edge strip around walls.

  4. 4

    Pump and level

    The screed is pumped in, dappled and left to settle to a flat surface in one visit.

  5. 5

    Dry and hand over

    Walk-on after 24–48 hours; moisture readings before coverings go down.

Signs your floor needs levelling before new flooring

  • A straightedge rocks or shows gaps across the room
  • Visible steps where rooms or an extension join
  • Old tiles or quarry tiles lifted, leaving an uneven base
  • A new covering such as large-format tile or LVT that needs a flat surface

Frequently asked

Getting the floor ready? Read our screed floor preparation checklist before booking a pour.

Get an uneven floor levelled

Send the floor area, roughly how far out it is and the flooring you plan. We reply the same working day.

Call LandlineGet a quoteWhatsApp