New Build Screeding · Devon

Uplyme New Build Screeding Specialists

On multi-plot developments in Uplyme we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Uplyme New Build Screeding Specialists

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

On multi-plot developments in Uplyme we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Uplyme scheme, so plot 1 and plot 40 come out identical.

Most of our Uplyme jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Uplyme sits Exeter (28 mi), and we work the surrounding villages on the same week's diary.

Uplyme projects we see most

  • Seafront apartments — a regular brief in Uplyme
  • 1930s coastal semis — a regular brief in Uplyme
  • Harbourside conversions — a regular brief in Uplyme
  • Guest-house retrofits — a regular brief in Uplyme
  • Tourism lets — a regular brief in Uplyme

Who this is for in Uplyme

Uplyme is a coastal town, so damp control, salt exposure and tight winter pour windows shape every brief. We work the diary around that — and around the holiday-let turnover that funds half the jobs here.

New Build Screeding in Uplyme — how it works

Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Uplyme site rather than a new quote for every unit.

Output on a typical Uplyme plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.

Materials and systems we use in Uplyme

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

What to expect on pour day in Uplyme

  1. 1

    Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates

  2. 2

    Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot

  3. 3

    Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn

  4. 4

    Protect each plot for 24-48 hours while the crew moves on to the next

  5. 5

    Moisture testing and a written handover record issued per plot

  6. 6

    Snagging and any remedial work coordinated directly with the site manager before final trades move in

Recent work near Uplyme

Renovation screed for a barn conversion near Honiton
Renovation screed for a barn conversion near Honiton
Large open-plan pour for a new-build near Cullompton
Large open-plan pour for a new-build near Cullompton
UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth

Trust points for a Uplyme brief

Hundreds of square metres poured around Uplyme in the last 12 months

Single-team continuity — same crew, same standards, every job

Written fixed-price quotes — no day-rate creep

Moisture-test handover record so flooring contractors take the slab on without dispute

FAQs from Uplyme clients

Do you provide RAMS for a new build site in Uplyme?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

How many plots can you screed per day on a Uplyme development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

Can you keep the same build-up across every plot?+

Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Uplyme site come out to the same depth and finish.

Do you price the whole Uplyme site or plot by plot?+

Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.

Can you scale up if the Uplyme programme accelerates?+

Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.

Coordinate UFH and screed across your Uplyme plots

One agreed build-up, repeated consistently on every unit, with pressure-testing coordinated plot by plot.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp