Commercial Screed · Devon

Uplyme Commercial Screed Specialists

Big floors get expensive when traditional screed slows the build. We pump 200-1000m² in a single visit across Uplyme and hand the floor back to the next trade within 48 hours.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Uplyme Commercial Screed Specialists

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Big floors get expensive when traditional screed slows the build. We pump 200-1000m² in a single visit across Uplyme and hand the floor back to the next trade within 48 hours.

Whether it's a single retail unit at small holiday-let trades or a 2,000m² distribution centre, the build-up is the same — DPM, insulation, screed, all to SR1.

Most of our Uplyme jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Uplyme sits Exeter (28 mi), and we work the surrounding villages on the same week's diary.

Common briefs across Uplyme

  • Seafront apartments — a regular brief in Uplyme
  • 1930s coastal semis — a regular brief in Uplyme
  • Harbourside conversions — a regular brief in Uplyme
  • Guest-house retrofits — a regular brief in Uplyme
  • Tourism lets — a regular brief in Uplyme

Who this is for in Uplyme

Uplyme is a coastal town, so damp control, salt exposure and tight winter pour windows shape every brief. We work the diary around that — and around the holiday-let turnover that funds half the jobs here.

Commercial Screed in Uplyme — how it works

We mobilise a static mixer and pump truck for larger Uplyme commercial sites, pumping 30-50m³ per day with a small crew. The screed is laid, levelled and spike-rolled in continuous bays of any size.

For commercial UFH we coordinate with the M&E contractor to pressure-test pipes the day before, then screed at the depth specified by the heating consultant.

Materials and systems we use in Uplyme

Cemfloor CT-C30-F6

High-strength cement-based screed — preferred for commercial loading.

Cemfloor Therm

For commercial UFH installations.

Heavy-duty PIR insulation

100-150mm to hit commercial U-value targets.

Movement joints

Set at doorway thresholds and around columns to manage thermal expansion.

What to expect on pour day in Uplyme

  1. 1

    Pre-start meeting with main contractor — programme, access, pump position, waste route

  2. 2

    Substrate prep, DPM and insulation install (us or the main contractor)

  3. 3

    Pour day: 30-50m³ pumped, levelled, spike-rolled per day

  4. 4

    48-hour cure under protection

  5. 5

    Moisture testing and handover record once dry

Latest jobs across Devon

Commercial pour at Heathfield, Newton Abbot
Commercial pour at Heathfield, Newton Abbot
Industrial-scale pour at Blackbrook, Taunton
Industrial-scale pour at Blackbrook, Taunton
Renovation screed for a barn conversion near Honiton
Renovation screed for a barn conversion near Honiton

What backs our Uplyme work

Hundreds of square metres poured around Uplyme in the last 12 months

Single-team continuity — same crew, same standards, every job

Written fixed-price quotes — no day-rate creep

Moisture-test handover record so flooring contractors take the slab on without dispute

Uplyme screed questions, answered

Do you provide RAMS and method statements for Uplyme sites?+

Yes — full RAMS, COSHH and insurance documentation issued ahead of mobilisation, formatted for your CDM principal contractor.

Are you Cemfloor-certified for commercial work?+

Yes — fully certified installer, with manufacturer support on every Uplyme commercial job and the 10-year guarantee on qualifying installs.

What about phased pours on live commercial sites?+

Common in Uplyme retail work — we phase by zone, with day joints managed correctly so the finished floor still reads as one slab.

Can you work weekends or out-of-hours in Uplyme?+

We do — retail fit-outs and live-environment jobs often need it. Weekend pours are quoted at a premium but we'll plan the programme with you.

What's your daily output on a commercial Uplyme job?+

Typically 30-50m³ per pour day with a single team — that's roughly 600-900m² at 50mm depth. Bigger pours are coordinated with multiple deliveries.

Do you handle the insulation and DPM as well?+

We can — many Uplyme main contractors prefer a single sub on the floor build-up. We'll price it either way.

Coverage across DT7

From Uplyme to the surrounding villages, we keep the radius tight so logistics stay simple.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp