Underfloor Heating Screed · Somerset

Underfloor Heating Screed Poured to SR1 in Martock

When Martock self-builders specify UFH, the screed is what makes the system efficient. We pump Cemfloor Therm directly around your pressure-tested pipework for full encapsulation.

Cemfloor-certified work near Martock

Manufacturer-backed install, ten-year guarantee, fully insured. Get a written quote.

Start a quote07791 510849 WhatsApp us
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Underfloor Heating Screed Poured to SR1 in Martock

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

When Martock self-builders specify UFH, the screed is what makes the system efficient. We pump Cemfloor Therm directly around your pressure-tested pipework for full encapsulation.

For Martock UFH builds the typical sequence is: insulation board down, pipes clipped and pressure-tested, edge insulation in place, then we pump and level in a single visit.

Most of our Martock jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Martock sits Taunton (18 mi), and we work the surrounding villages on the same week's diary.

Who this is for in Martock

Martock runs a healthy mix of residential renovation and small-to-medium commercial fit-out. We price both, and run both with the same fixed-price approach.

Why Martock site context matters

County

Somerset

District

South Somerset

Postcode

TA12

Nearest city

Taunton (18 mi)

Nearest motorway

M5 (J25, ~20 mi)

Primary A-road

B3165

Local industries

Yandles workshops, agriculture

Common builds

hamstone cottages, Yandles-side commercial

Underfloor Heating Screed in Martock — how it works

We pour Cemfloor Therm liquid screed over your UFH pipes at 50mm above pipe (typically 65-75mm total over insulation), giving full pipe encapsulation, fast thermal response and a finished surface flat to SR1.

The screed self-levels around every loop, eliminating the voids you get under hand-laid traditional screed. That means the floor responds faster when the heating calls for it, and stores less wasted heat.

What to expect on pour day in Martock

  1. 1

    UFH installer fits manifold, pipes and pressure-tests to 6 bar

  2. 2

    We confirm edge insulation, DPM and pipe coverage depth

  3. 3

    Pump and level the screed with pipes still under pressure

  4. 4

    Slow commissioning of the heating — usually after 7 days, ramping per manufacturer spec

  5. 5

    Floor coverings once moisture is signed off and commissioning is complete

Latest jobs across Somerset

UFH screed in a kitchen-diner extension, Taunton
UFH screed in a kitchen-diner extension, Taunton
Industrial-scale pour at Blackbrook, Taunton
Industrial-scale pour at Blackbrook, Taunton
UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth

Materials and systems we use in Martock

Cemfloor Therm

Liquid screed engineered for UFH — lambda 2.1 W/mK, fast response.

PIR/Phenolic insulation board

70-150mm typical depending on build regs U-value target.

Edge insulation strip

Critical around UFH zones to allow thermal expansion.

Pressure-testing kit

Pipes held at 6 bar through the pour to flag any damage immediately.

Martock screed questions, answered

How does this affect my floor coverings in Martock?+

Once commissioned and the floor moisture content is signed off (CM test, typically below 0.5% for tile), most coverings go down as normal. We hand you a commissioning record.

Does liquid UFH screed improve EPC ratings?+

Indirectly — yes. Faster response and lower running temperatures help heat-pump COP, which feeds into your SAP/EPC. We'll share the manufacturer data your assessor needs.

Will the screed crack as the UFH heats up?+

Properly isolated at the edges and at doorway joints, no. We pour with the pipes pressure-tested and follow a controlled commissioning schedule.

What if a pipe leaks during the pour?+

Pipes are held at 6 bar through the pour. Any pressure drop is flagged immediately and we stop, fix and continue — this is exactly why we keep the manifold under test.

What depth of screed over UFH pipes do you recommend?+

Minimum 50mm cover above the highest pipe — usually a 65-75mm total slab over insulation. Thicker if you want more thermal mass.

When can I switch the underfloor heating on in Martock?+

On Cemfloor Therm we typically start a slow commissioning cycle from day 7, ramping 5°C per day per manufacturer spec. Forcing it earlier risks cracking, so we hold Martock clients to the schedule.

What backs our Martock work

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Somerset — fresh Martock-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Cemfloor-certified work near Martock

Manufacturer-backed install, ten-year guarantee, fully insured. Get a written quote.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp