New Build Screeding · Somerset

New Build Screeding Poured to SR1 in Martock

Developers building across Martock need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.

Cemfloor-certified plot screeding near Martock

Manufacturer-backed installs, per-plot moisture records and a ten-year guarantee on qualifying units.

Get a written quote07791 510849 WhatsApp us
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for New Build Screeding Poured to SR1 in Martock

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Developers building across Martock need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.

Output on a typical Martock plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.

Most of our Martock jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Martock sits Taunton (18 mi), and we work the surrounding villages on the same week's diary.

Right fit for Martock homeowners and contractors alike

Martock runs a healthy mix of residential renovation and small-to-medium commercial fit-out. We price both, and run both with the same fixed-price approach.

What we plan around in Martock

County

Somerset

District

South Somerset

Postcode

TA12

Nearest city

Taunton (18 mi)

Nearest motorway

M5 (J25, ~20 mi)

Primary A-road

B3165

Local industries

Yandles workshops, agriculture

Common builds

hamstone cottages, Yandles-side commercial

New Build Screeding in Martock — how it works

We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Martock development moves through screed without a gap in the build sequence.

Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Martock site rather than a new quote for every unit.

How a Martock pour runs

  1. 1

    Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates

  2. 2

    Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot

  3. 3

    Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn

  4. 4

    Protect each plot for 24-48 hours while the crew moves on to the next

  5. 5

    Moisture testing and a written handover record issued per plot

  6. 6

    Snagging and any remedial work coordinated directly with the site manager before final trades move in

Latest jobs across Somerset

Industrial-scale pour at Blackbrook, Taunton
Industrial-scale pour at Blackbrook, Taunton
UFH screed in a kitchen-diner extension, Taunton
UFH screed in a kitchen-diner extension, Taunton
Renovation screed for a barn conversion near Honiton
Renovation screed for a barn conversion near Honiton

Specifications suited to Martock builds

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

Martock screed questions, answered

Do you offer a guarantee on new build plots?+

Yes, as a Cemfloor-certified installer, qualifying plots are backed by the manufacturer's 10-year guarantee, issued per unit as part of the handover pack.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

Can you keep the same build-up across every plot?+

Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Martock site come out to the same depth and finish.

Do you provide RAMS for a new build site in Martock?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

How many plots can you screed per day on a Martock development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

Do you price the whole Martock site or plot by plot?+

Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.

What backs our Martock work

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Somerset — fresh Martock-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Cemfloor-certified plot screeding near Martock

Manufacturer-backed installs, per-plot moisture records and a ten-year guarantee on qualifying units.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp