Somerset Coverage

Liquid Screed Pours Across Martock & Nearby

We pour Cemfloor liquid screed across Martock, with a 30-mile working radius covering Ash, Martock Trading Estate and the wider Somerset area.

Cemfloor screed across TA12

From Martock to the surrounding villages, one team, one fixed price.

Get in touch07765 712609

We pour Cemfloor liquid screed across Martock, with a 30-mile working radius covering Ash, Martock Trading Estate and the wider Somerset area.

We're Martock is a hamstone South Somerset village with a strong small-industrial workload. Our coverage runs across TA12, taking in Ash and out toward Martock Trading Estate, with the M5 (J25, ~20 mi) on hand for materials and pump trucks.

Most of our Martock jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Martock sits Taunton (18 mi), and we work the surrounding villages on the same week's diary.

Built for Martock homeowners and contractors alike

Martock runs a healthy mix of residential renovation and small-to-medium commercial fit-out. We price both, and run both with the same fixed-price approach.

Martock at a glance

County

Somerset

District

South Somerset

Postcode

TA12

Nearest city

Taunton (18 mi)

Nearest motorway

M5 (J25, ~20 mi)

Primary A-road

B3165

Local industries

Yandles workshops, agriculture

Common builds

hamstone cottages, Yandles-side commercial

Liquid screed in Martock — how it works

Build-up is straightforward: insulation, DPM, edge isolation, pour. We handle the lot or we work to the main contractor's substrate — whichever suits your Martock job.

On larger Martock jobs we mobilise a static mixer; on residential we use ready-mix delivery and a smaller pump. Either way, the finished floor reads the same.

Step-by-step for a Martock job

  1. 1

    Site visit and written quote

  2. 2

    Prep — insulation, DPM, edge isolation, UFH coordination

  3. 3

    Pump day — single-visit pour, level and spike-roll

  4. 4

    Cover and cure for 24-48 hours

  5. 5

    Moisture-test sign-off, floor coverings

Recent work near Martock

Industrial-scale pour at Blackbrook, Taunton
Industrial-scale pour at Blackbrook, Taunton
UFH screed in a kitchen-diner extension, Taunton
UFH screed in a kitchen-diner extension, Taunton
Renovation screed for a barn conversion near Honiton
Renovation screed for a barn conversion near Honiton

Cemfloor systems for Martock

Cemfloor CT-C30-F6

Cement-based liquid screed — robust, low-shrinkage, fast-drying.

Cemfloor Therm

Thermally-optimised for UFH.

PIR insulation + DPM

Build-up tuned to your build regs U-value.

FAQs from Martock clients

How long does the floor take to dry in Martock?+

Roughly one day per millimetre of depth, ambient conditions allowing. We'll give you specific guidance for your Martock pour.

Do you offer a guarantee?+

As a Cemfloor-certified installer, qualifying installs are backed by a 10-year manufacturer-supported guarantee.

Do you cover Martock?+

Yes — Martock sits inside our regular 30-mile working radius and we have active diary there most months.

Can you give a fixed-price quote?+

Yes — every Martock quote is a written fixed price against a defined scope. No day-rate surprises.

Do you handle UFH coordination?+

Yes — we work with whichever UFH installer is on your Martock project and align dates with their pressure-test schedule.

Can you screed over an existing concrete slab?+

Usually yes — from 30mm bonded if the slab is sound. We'll inspect the substrate at the Martock site visit.

Trust points for a Martock brief

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Somerset — fresh Martock-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Cemfloor screed across TA12

From Martock to the surrounding villages, one team, one fixed price.