New build sites in Kenton run to a programme, not a wish list, and screed is usually the trade holding up everything behind it. We sequence plot by plot so your follow-on trades never sit idle.
Get a fixed price for Kenton New Build Screeding Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
New build sites in Kenton run to a programme, not a wish list, and screed is usually the trade holding up everything behind it. We sequence plot by plot so your follow-on trades never sit idle.
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Kenton site rather than a new quote for every unit.
Most of our Kenton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Kenton sits Exeter (8 mi), and we work the surrounding villages on the same week's diary.
New Build Screeding in Kenton — how it works
Output on a typical Kenton plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Kenton scheme, so plot 1 and plot 40 come out identical.
What we plan around in Kenton
County
Devon
District
Teignbridge
Postcode
EX6
Nearest city
Exeter (8 mi)
Nearest motorway
M5 (J30, ~7 mi)
Primary A-road
A379
Local industries
Powderham Estate, agriculture
Common builds
estate cottages, Powderham-side conversions
Where liquid screed earns its keep in Kenton
- Estate cottages — a regular brief in Kenton
- Powderham-side conversions — a regular brief in Kenton
- New infill homes — a regular brief in Kenton
- Powderham Estate — a regular brief in Kenton
- Agriculture — a regular brief in Kenton
Kenton-area projects



What to expect on pour day in Kenton
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Why Kenton clients pick us
Adjacent areas — usually same-week diary
Materials and systems we use in Kenton
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
What people in Kenton usually ask
Do you price the whole Kenton site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
How many plots can you screed per day on a Kenton development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Do you provide RAMS for a new build site in Kenton?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Kenton site come out to the same depth and finish.
Can you scale up if the Kenton programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Multi-plot pours across EX6
From a handful of units to a full Kenton phase, we plan crew and pump around your build programme, not ours.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site