New Build Screeding · Devon
New Build Screeding in Dunkeswell
On multi-plot developments in Dunkeswell we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
Get a fixed price for New Build Screeding in Dunkeswell
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
On multi-plot developments in Dunkeswell we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Dunkeswell scheme, so plot 1 and plot 40 come out identical.
Most of our Dunkeswell jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Dunkeswell sits Honiton (6 mi), and we work the surrounding villages on the same week's diary.
Common briefs across Dunkeswell
- Airfield hangars — a regular brief in Dunkeswell
- New self-builds — a regular brief in Dunkeswell
- Rural industrial units — a regular brief in Dunkeswell
- Dunkeswell Airfield — a regular brief in Dunkeswell
- Skydiving — a regular brief in Dunkeswell
Who this is for in Dunkeswell
Dunkeswell skews commercial — trade parks like Dunkeswell Airfield Business Park, contractor-led fit-outs, and developer estates. We price as a sub-contractor on programme, with RAMS and CDM documentation issued ahead of mobilisation.
New Build Screeding in Dunkeswell — how it works
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Dunkeswell site rather than a new quote for every unit.
Output on a typical Dunkeswell plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
Materials and systems we use in Dunkeswell
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
What to expect on pour day in Dunkeswell
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Recent work near Dunkeswell



Other areas we cover near Dunkeswell
Trust points for a Dunkeswell brief
Hundreds of square metres poured around Dunkeswell in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
FAQs from Dunkeswell clients
Do you provide RAMS for a new build site in Dunkeswell?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How many plots can you screed per day on a Dunkeswell development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you price the whole Dunkeswell site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Can you scale up if the Dunkeswell programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Dunkeswell site come out to the same depth and finish.
Screeding a new build site in Dunkeswell?
Send us the plot count, floor areas and target handover dates, and we'll come back with a development-wide fixed price.