Liquid screed pour near Plymtree New Build Screeding Specialists

New Build Screeding · Devon

Plymtree New Build Screeding Specialists

On multi-plot developments in Plymtree we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Plymtree New Build Screeding Specialists

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

On multi-plot developments in Plymtree we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Plymtree scheme, so plot 1 and plot 40 come out identical.

Most of our Plymtree jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Plymtree sits Cullompton (5 mi), and we work the surrounding villages on the same week's diary.

Why Plymtree site context matters

County

Devon

District

East Devon

Postcode

EX15

Nearest city

Cullompton (5 mi)

Nearest motorway

M5 (J28, ~6 mi)

Primary A-road

B3176

Local industries

cider, agriculture

Common builds

listed cob cottages, small self-builds

Plymtree projects we see most

  • Listed cob cottages — a regular brief in Plymtree
  • Small self-builds — a regular brief in Plymtree
  • Orchard outbuildings — a regular brief in Plymtree
  • Cider — a regular brief in Plymtree
  • Agriculture — a regular brief in Plymtree

New Build Screeding in Plymtree — how it works

New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Plymtree scheme, so plot 1 and plot 40 come out identical.

We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Plymtree development moves through screed without a gap in the build sequence.

Materials and systems we use in Plymtree

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

Floors poured around Plymtree

Large open-plan pour for a new-build near Cullompton
Large open-plan pour for a new-build near Cullompton
Renovation screed for a barn conversion near Honiton
Renovation screed for a barn conversion near Honiton
Self-build UFH pour near Tiverton
Self-build UFH pour near Tiverton

Proof from the Devon workload

Hundreds of square metres poured around Plymtree in the last 12 months

Single-team continuity — same crew, same standards, every job

Written fixed-price quotes — no day-rate creep

Moisture-test handover record so flooring contractors take the slab on without dispute

Common Plymtree build questions

Are you set up for NHBC or LABC warranty requirements?+

Yes, our build-ups and documentation are prepared to match whichever warranty provider your Plymtree development is registered with.

How many plots can you screed per day on a Plymtree development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

Do you provide RAMS for a new build site in Plymtree?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

Do you price the whole Plymtree site or plot by plot?+

Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.

Can you scale up if the Plymtree programme accelerates?+

Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.

From the pre-start meeting to the last plot's moisture sign-off, our Plymtree new build jobs run as one coordinated package, priced against the whole site, not negotiated unit by unit.

Multi-plot pours across EX15

From a handful of units to a full Plymtree phase, we plan crew and pump around your build programme, not ours.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp