New Build Screeding · Devon
New Build Screeding Poured to SR1 in Hemyock
Developers building across Hemyock need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Get a fixed price for New Build Screeding Poured to SR1 in Hemyock
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Developers building across Hemyock need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Output on a typical Hemyock plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
Most of our Hemyock jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Hemyock sits Exeter (22 mi), and we work the surrounding villages on the same week's diary.
New Build Screeding in Hemyock — how it works
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Hemyock scheme, so plot 1 and plot 40 come out identical.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Hemyock development moves through screed without a gap in the build sequence.
What we plan around in Hemyock
County
Devon
District
Mid Devon
Postcode
EX15
Nearest city
Exeter (22 mi)
Nearest motorway
M5 (J26, ~4 mi)
Primary A-road
B3391
Local industries
agriculture, equestrian yards
Common builds
stone farmhouses, barn conversions
Where liquid screed earns its keep in Hemyock
- Stone farmhouses — a regular brief in Hemyock
- Barn conversions — a regular brief in Hemyock
- Cottage extensions — a regular brief in Hemyock
- Occasional new-build cottages — a regular brief in Hemyock
- Agriculture — a regular brief in Hemyock
Floors poured around Hemyock



How a Hemyock pour runs
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Proof from the Devon workload
Adjacent areas — usually same-week diary
Specifications suited to Hemyock builds
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Common Hemyock build questions
Can you work to our build programme rather than your own diary?+
Yes, that's the point of new build screeding, we plan crew and pump mobilisation around your plot handover dates, not the other way round.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you provide RAMS for a new build site in Hemyock?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How many plots can you screed per day on a Hemyock development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Can you scale up if the Hemyock programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Do you price the whole Hemyock site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Keep your Hemyock plots on programme
Screed is often the trade holding up the schedule. Let's agree pump access and plot sequencing before it becomes a bottleneck.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
