Liquid Screed · Devon

Liquid Screed Poured to SR1 in Hemyock

Across Hemyock we lay self-levelling Cemfloor screed at depths from 30mm, pumping straight off the truck and finishing to a true SR1 — no hand-trowelling, no cold joints.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Liquid Screed Poured to SR1 in Hemyock

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Across Hemyock we lay self-levelling Cemfloor screed at depths from 30mm, pumping straight off the truck and finishing to a true SR1 — no hand-trowelling, no cold joints.

Liquid screed bonds into a single monolithic layer with no bays, no day joints and no need for steel mesh — it's poured around any UFH pipework you've already pressure-tested.

Most of our Hemyock jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Hemyock sits Exeter (22 mi), and we work the surrounding villages on the same week's diary.

Liquid Screed in Hemyock — how it works

We pump Cemfloor calcium-sulphate screed from a static mixer into your building, level it with a dappling bar, and walk away with a floor that's typically dry enough for floor coverings in roughly one day per millimetre of depth.

The screed arrives ready-mixed on a truck, gets pumped through a hose to wherever it's needed in the building, and self-levels to within a couple of millimetres across the room. We spike-roll it to release air, then leave it.

EX15 access, routes and logistics

County

Devon

District

Mid Devon

Postcode

EX15

Nearest city

Exeter (22 mi)

Nearest motorway

M5 (J26, ~4 mi)

Primary A-road

B3391

Local industries

agriculture, equestrian yards

Common builds

stone farmhouses, barn conversions

What Hemyock builds usually need

  • Stone farmhouses — a regular brief in Hemyock
  • Barn conversions — a regular brief in Hemyock
  • Cottage extensions — a regular brief in Hemyock
  • Occasional new-build cottages — a regular brief in Hemyock
  • Agriculture — a regular brief in Hemyock

Latest jobs across Devon

Large open-plan pour for a new-build near Cullompton
Large open-plan pour for a new-build near Cullompton
Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension

What to expect on pour day in Hemyock

  1. 1

    Site visit and written quote — confirm depths, area, access, build-up

  2. 2

    We prep edge insulation, polythene DPM and any UFH coordination

  3. 3

    Pump day: ready-mixed screed pumped, levelled and spike-rolled in one pour

  4. 4

    Cover and protect for 24-48 hours

  5. 5

    Light foot traffic from day 2; floor coverings once moisture content is signed off

What backs our Hemyock work

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Hemyock-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Materials and systems we use in Hemyock

Cemfloor CT-C30-F6

Cement-based liquid screed — fast-drying, low shrinkage, suitable for most floor coverings.

Cemfloor Therm

Optimised for underfloor heating with high thermal conductivity.

Acoustic and thermal insulation underlay

PIR, EPS or acoustic mat depending on the build-up.

Edge isolation strip

10mm closed-cell foam to allow thermal movement.

Hemyock screed questions, answered

What's the cost difference vs traditional screed?+

Per square metre liquid screed is a little more expensive, but the labour saving, speed and flatness usually make total project cost lower — especially on larger Hemyock jobs.

Can liquid screed go over an existing concrete slab?+

Yes — typically unbonded over a DPM and slip membrane, from 35mm. We'll assess the substrate at the Hemyock site visit.

How quickly can I walk on a liquid screed floor in Hemyock?+

Light foot traffic from 24-48 hours after the pour. Heavy loading, follow-on trades and final floor coverings depend on depth and ambient conditions — we leave you with clear drying guidance for your specific Hemyock job.

Can you pour in cold weather?+

Yes, with the right ambient control. We won't pour below 5°C and we'll discuss frost protection for any Hemyock pour in the colder months.

Do I need to be on site for the pour in Hemyock?+

Not necessarily — we usually agree access with the main contractor or self-builder and run the pour with our own team. We'll confirm the Hemyock access route, pump position and waste route before the day.

Do you offer a guarantee?+

Yes — as a Cemfloor-certified installer, qualifying jobs are backed by a 10-year manufacturer-supported guarantee.

Need Liquid Screed priced for Hemyock?

Tell us the square metres and access notes. Most Hemyock quotes go out the same day.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp