Devon
Underfloor heating screed in Devon
Heat pumps are spreading through Devon's off-gas villages, and most of them heat the house through pipes in the floor. A flowing screed surrounds every pipe, which is why it is our standard choice over underfloor heating.
Underfloor heating screed in Devon
Send a few job details for a fixed price.
Or call our landline on 01392 237700
Why Devon homes are switching
Away from Exeter and the larger towns, many Devon homes have never had mains gas. Oil, LPG and storage heaters are common in Mid Devon farmhouses and on the fringes of Dartmoor, and when those systems are replaced a heat pump is the usual choice. Heat pumps run at low water temperatures, so they depend on a large, evenly warmed surface, and a floor with its pipes fully embedded in screed provides exactly that.
Our Devon photos include a self-build heating pour near Tiverton and underfloor heating screed in a coastal apartment in Exmouth. They show the two ends of the work: a new house on open ground and a flat by the sea where access is tighter.
Depth over the pipes
Minimum cover depends on what the screed sits on: 30mm over the pipe when bonded to a slab, 35mm unbonded on a membrane, and 40mm floating over insulation. Most Devon extensions and new ground floors end up at 50 to 65mm overall. Going thinner risks cracks and shadow lines above the pipe runs, so we confirm the depth with laser datum points before pumping.
The heating circuit is pressure tested and kept under pressure while we pour, so a leak shows straight away instead of weeks later beneath a finished floor.
Timing with the heating engineer
On self-builds around Crediton, Cullompton and the Culm valley, the screed date hangs on two other trades: the heating installer finishing the pipework, and the builder getting the roof and windows on. We would rather be booked early with a provisional date than squeezed in at the end. Once poured, an anhydrite screed needs at least seven days before first heat, and commissioning follows the manufacturer's schedule. Cement-based screeds dry at about a millimetre a day for the first 40mm.
Cost factors for a heated floor
A heated floor is priced on area and depth like any other, but here the depth is fixed by pipe cover rather than chosen, so the build-up drawing matters. Access, the mix and the travel band are the other variables, and within our regular area around Exeter there is no travel surcharge. The underfloor heating screed guide covers mixes, drying and the mistakes we see most.
Underfloor heating screed: Devon coverage
Underfloor heating screed is available across Devon, including in Tiverton, Crediton, Cullompton, Silverton, Bampton, Uffculme, Willand, Hemyock, Exmouth, Lympstone, Budleigh Salterton, Woodbury, Chudleigh, Bovey Tracey, Moretonhampstead, Ashburton. Every place on the Devon page
Underfloor heating screed in Devon: questions
- Can I run the heat pump to dry the screed faster?
- Not until the screed is ready. Anhydrite needs at least seven days before first heat, and the temperature then rises in stages to the manufacturer's schedule. Forcing it early risks cracking.
- Which screed suits underfloor heating in a Devon bathroom?
- A cement-based screed such as Cemfloor Therm, because it copes with repeated wetting. Anhydrite works well in dry rooms like lounges and bedrooms.
- What should be ready before you arrive?
- Insulation laid and taped, perimeter strip fixed round the walls, membrane in place, pipes clipped at the design spacing and the circuit under pressure. We check each of these on the day before pumping.
