New Build Screeding · Dorset
New Build Screeding Poured to SR1 in Yetminster
Developers building across Yetminster need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.

Get a fixed price for New Build Screeding Poured to SR1 in Yetminster
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Developers building across Yetminster need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Output on a typical Yetminster plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
Most of our Yetminster jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Yetminster sits Yeovil (7 mi), and we work the surrounding villages on the same week's diary.
Local facts that shape every Yetminster pour
County
Dorset
District
Dorset
Postcode
DT9
Nearest city
Yeovil (7 mi)
Nearest motorway
M5 (J25, ~32 mi)
Primary A-road
B3148
Local industries
agriculture, equestrian yards
Common builds
stone farmhouses, barn conversions
New Build Screeding in Yetminster — how it works
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Yetminster scheme, so plot 1 and plot 40 come out identical.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Yetminster development moves through screed without a gap in the build sequence.
Right fit for Yetminster rural self-builders and farms
Yetminster sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Specifications suited to Yetminster builds
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Floors poured around Yetminster



Proof from the Dorset workload
Common Yetminster build questions
Can you work to our build programme rather than your own diary?+
Yes, that's the point of new build screeding, we plan crew and pump mobilisation around your plot handover dates, not the other way round.
Do you provide RAMS for a new build site in Yetminster?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
How many plots can you screed per day on a Yetminster development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Can you scale up if the Yetminster programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Yetminster site come out to the same depth and finish.
Other areas we cover near Yetminster
Yetminster developments reward a screed contractor who plans against the build programme, not just square metreage, agree the sequence once and every plot follows the same rhythm.
Keep your Yetminster plots on programme
Screed is often the trade holding up the schedule. Let's agree pump access and plot sequencing before it becomes a bottleneck.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
