New Build Screeding · Somerset
New Build Screeding in Yeovil
On multi-plot developments in Yeovil we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
Coordinate UFH and screed across your Yeovil plots
One agreed build-up, repeated consistently on every unit, with pressure-testing coordinated plot by plot.
Start the conversation07791 510849 WhatsApp usGet a fixed price for New Build Screeding in Yeovil
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
On multi-plot developments in Yeovil we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Yeovil scheme, so plot 1 and plot 40 come out identical.
Most of our Yeovil jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Yeovil sits Taunton (28 mi), and we work the surrounding villages on the same week's diary.
New Build Screeding in Yeovil — how it works
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Yeovil scheme, so plot 1 and plot 40 come out identical.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Yeovil development moves through screed without a gap in the build sequence.
Why Yeovil site context matters
County
Somerset
District
South Somerset
Postcode
BA20–BA22
Nearest city
Taunton (28 mi)
Nearest motorway
M5 (J25, ~30 mi)
Primary A-road
A30 / A37 / A303
Local industries
aerospace (Leonardo), glove/textiles heritage
Common builds
Leonardo Helicopters offices, stone terraces
Yeovil projects we see most
- Leonardo Helicopters offices — a regular brief in Yeovil
- Stone terraces — a regular brief in Yeovil
- Large new estates at Lufton — a regular brief in Yeovil
- Aerospace (Leonardo) — a regular brief in Yeovil
- Glove/textiles heritage — a regular brief in Yeovil
Floors poured around Yeovil



How a Yeovil pour runs
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Proof from the Somerset workload
Hundreds of square metres poured around Yeovil in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Nearby villages and towns
Specifications suited to Yeovil builds
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Common Yeovil build questions
Can you work to our build programme rather than your own diary?+
Yes, that's the point of new build screeding, we plan crew and pump mobilisation around your plot handover dates, not the other way round.
How many plots can you screed per day on a Yeovil development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you provide RAMS for a new build site in Yeovil?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
Do you price the whole Yeovil site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Yeovil site come out to the same depth and finish.
Coordinate UFH and screed across your Yeovil plots
One agreed build-up, repeated consistently on every unit, with pressure-testing coordinated plot by plot.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
