Renovation Screed · Somerset
Wedmore Renovation Screed Specialists
Renovation floors in Wedmore rarely run true — old timber decks sag, original slabs slope, and threshold heights are tight. Liquid screed fixes all three in a single morning.

Get a fixed price for Wedmore Renovation Screed Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Renovation floors in Wedmore rarely run true — old timber decks sag, original slabs slope, and threshold heights are tight. Liquid screed fixes all three in a single morning.
Where you're stripping back to a sound original slab in Wedmore, we'll prep, prime and bond a thin liquid screed straight onto it from 30mm — no need to dig out.
Most of our Wedmore jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Wedmore sits Weston-super-Mare (12 mi), and we work the surrounding villages on the same week's diary.
BS28 access, routes and logistics
County
Somerset
District
Sedgemoor
Postcode
BS28
Nearest city
Weston-super-Mare (12 mi)
Nearest motorway
M5 (J22, ~10 mi)
Primary A-road
B3151
Local industries
agriculture, equestrian yards
Common builds
stone farmhouses, barn conversions
Renovation Screed in Wedmore — how it works
Renovation pours typically run unbonded over insulation, with edge isolation against existing walls. We can lay from 35mm where headroom is tight, or full 65-75mm builds where the room can take it.
Where you're stripping back to a sound original slab in Wedmore, we'll prep, prime and bond a thin liquid screed straight onto it from 30mm — no need to dig out.
Built for Wedmore rural self-builders and farms
Wedmore sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Cemfloor systems for Wedmore
Cemfloor CT-C30-F6 (thin-section)
Where minimum depth matters more than maximum mass.
Cemfloor Therm
Retro-fit UFH in renovation builds.
Acoustic underlay
Critical for {town} flat conversions where impact noise is a concern.
Self-levelling overlay primer
For bonded thin-section pours over existing slabs.
Latest jobs across Somerset



What backs our Wedmore work
Wedmore screed questions, answered
What's the disruption like?+
Pump day is loud for a couple of hours. After that, the room is cordoned for 24-48 hours while the floor cures. We work clean and protect adjacent finishes.
Will the screed stick to my old skirtings?+
We fit edge isolation strip against every wall before the pour — no bonding to skirtings, no risk to plaster.
Can you screed over my existing concrete floor in Wedmore?+
Usually yes — if the slab is sound we bond a thin liquid screed straight on top from 30mm. We'll assess the Wedmore substrate at the site visit and price accordingly.
Is liquid screed safe over a heritage property in Wedmore?+
With proper edge isolation and movement joints, yes. We discuss any conservation-area or listed-building constraints up front.
Will it work with my new UFH retro-fit?+
Yes — Cemfloor Therm at 50mm above pipe gives you full UFH performance in a renovation build-up most original structures can accommodate.
Can you do a single room rather than the whole house?+
Yes — single-room renovation pours are a regular run for us across Wedmore, with movement joints at the doorway to isolate from neighbouring rooms.
Wedmore-area service radius
From the first site visit to the final laitance sand, our Wedmore jobs are run as one fixed-price piece of work — no creeping extras.
Coverage across BS28
From Wedmore to the surrounding villages, we keep the radius tight so logistics stay simple.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
