New Build Screeding · Devon
New Build Screeding — Teignmouth, Devon
Developers building across Teignmouth need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.

Get a fixed price for New Build Screeding — Teignmouth, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Developers building across Teignmouth need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Output on a typical Teignmouth plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
Most of our Teignmouth jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Teignmouth sits Exeter (15 mi), and we work the surrounding villages on the same week's diary.
Common briefs across Teignmouth
- Georgian seafront houses — a regular brief in Teignmouth
- Port-side commercial — a regular brief in Teignmouth
- Modern infill flats — a regular brief in Teignmouth
- Working port — a regular brief in Teignmouth
- Fishing — a regular brief in Teignmouth
Built for Teignmouth coastal residential and hospitality clients
Teignmouth is a coastal town, so damp control, salt exposure and tight winter pour windows shape every brief. We work the diary around that — and around the holiday-let turnover that funds half the jobs here.
New Build Screeding in Teignmouth — how it works
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Teignmouth scheme, so plot 1 and plot 40 come out identical.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Teignmouth development moves through screed without a gap in the build sequence.
Cemfloor systems for Teignmouth
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Step-by-step for a Teignmouth job
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Floors poured around Teignmouth



Other areas we cover near Teignmouth
Proof from the Devon workload
Common Teignmouth build questions
What happens if a plot isn't ready when our crew arrives?+
We build flexibility into the plot sequence and communicate daily with the site manager, moving to the next ready plot rather than losing the day.
How many plots can you screed per day on a Teignmouth development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Do you provide RAMS for a new build site in Teignmouth?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Can you scale up if the Teignmouth programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Do you price the whole Teignmouth site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Book your Teignmouth development into the diary
Multi-plot schemes need booking well ahead. Reserve your Teignmouth pour dates now and we'll confirm logistics with your site manager.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
