New Build Screeding · Devon
Cemfloor-Certified New Build Screeding Across Torquay
Torquay new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.
Get a fixed price for Cemfloor-Certified New Build Screeding Across Torquay
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Torquay new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Torquay development moves through screed without a gap in the build sequence.
Most of our Torquay jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Torquay sits Exeter (22 mi), and we work the surrounding villages on the same week's diary.
Built for Torquay contractors and developers
Torquay skews commercial — trade parks like Lymington Road, contractor-led fit-outs, and developer estates. We price as a sub-contractor on programme, with RAMS and CDM documentation issued ahead of mobilisation.
TQ1–TQ2 access, routes and logistics
County
Devon
District
Torbay
Postcode
TQ1–TQ2
Nearest city
Exeter (22 mi)
Nearest motorway
M5 (J31, ~21 mi)
Primary A-road
A380 / A3022
Local industries
hospitality, care homes
Common builds
Victorian hotels, cliffside apartments
New Build Screeding in Torquay — how it works
Output on a typical Torquay plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Torquay scheme, so plot 1 and plot 40 come out identical.
Step-by-step for a Torquay job
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Torquay-area projects



Cemfloor systems for Torquay
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Torquay-area service radius
What people in Torquay usually ask
Can you scale up if the Torquay programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Do you provide RAMS for a new build site in Torquay?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How many plots can you screed per day on a Torquay development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Torquay site come out to the same depth and finish.
Do you price the whole Torquay site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Why Torquay clients pick us
- 01Cemfloor-certified, fully insured, CDM-aware
- 02Coordinated with most South West UFH installers
- 03Pre-start meeting standard on every commercial job
- 04Local knowledge — we know the M5 (J31, ~21 mi) access window and A380 / A3022 traffic patterns
Cemfloor-certified plot screeding near Torquay
Manufacturer-backed installs, per-plot moisture records and a ten-year guarantee on qualifying units.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700