New Build Screeding · Devon
New Build Screeding for Rockbeare Builds
New build sites in Rockbeare run to a programme, not a wish list, and screed is usually the trade holding up everything behind it. We sequence plot by plot so your follow-on trades never sit idle.
Get a fixed price for New Build Screeding for Rockbeare Builds
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
New build sites in Rockbeare run to a programme, not a wish list, and screed is usually the trade holding up everything behind it. We sequence plot by plot so your follow-on trades never sit idle.
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Rockbeare site rather than a new quote for every unit.
Most of our Rockbeare jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Rockbeare sits Exeter (7 mi), and we work the surrounding villages on the same week's diary.
Where liquid screed earns its keep in Rockbeare
- Airport-side new builds — a regular brief in Rockbeare
- Trade units — a regular brief in Rockbeare
- Rural cottages — a regular brief in Rockbeare
- Exeter Airport — a regular brief in Rockbeare
- Skypark logistics — a regular brief in Rockbeare
Right fit for Rockbeare contractors and developers
Rockbeare skews commercial — trade parks like Skypark, contractor-led fit-outs, and developer estates. We price as a sub-contractor on programme, with RAMS and CDM documentation issued ahead of mobilisation.
New Build Screeding in Rockbeare — how it works
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Rockbeare site rather than a new quote for every unit.
Output on a typical Rockbeare plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
Specifications suited to Rockbeare builds
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
How a Rockbeare pour runs
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Recent work near Rockbeare



Adjacent areas — usually same-week diary
Trust points for a Rockbeare brief
FAQs from Rockbeare clients
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
How many plots can you screed per day on a Rockbeare development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Do you provide RAMS for a new build site in Rockbeare?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Rockbeare site come out to the same depth and finish.
Can you scale up if the Rockbeare programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Do you price the whole Rockbeare site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Multi-plot pours across EX5
From a handful of units to a full Rockbeare phase, we plan crew and pump around your build programme, not ours.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.