Devon Coverage
Rockbeare's Cemfloor-Certified Screed Team
Liquid screed in Rockbeare solves the flatness, speed and UFH-response problems that traditional sand-and-cement can't.
Liquid screed in Rockbeare solves the flatness, speed and UFH-response problems that traditional sand-and-cement can't.
We're Rockbeare is an Exeter-Airport-adjacent village dominated by aviation and logistics work. Our coverage runs across EX5, taking in Marsh Green and out toward Exeter Airport, with the M5 (J29, ~5 mi) on hand for materials and pump trucks.
Most of our Rockbeare jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Rockbeare sits Exeter (7 mi), and we work the surrounding villages on the same week's diary.
What Rockbeare builds usually need
- Airport-side new builds — a regular brief in Rockbeare
- Trade units — a regular brief in Rockbeare
- Rural cottages — a regular brief in Rockbeare
- Exeter Airport — a regular brief in Rockbeare
- Skypark logistics — a regular brief in Rockbeare
Who this is for in Rockbeare
Rockbeare skews commercial — trade parks like Exeter Airport, contractor-led fit-outs, and developer estates. We price as a sub-contractor on programme, with RAMS and CDM documentation issued ahead of mobilisation.
Liquid screed in Rockbeare — how it works
On larger Rockbeare jobs we mobilise a static mixer; on residential we use ready-mix delivery and a smaller pump. Either way, the finished floor reads the same.
We pour Cemfloor liquid screed at SR1 flatness, pumping straight off the truck into the building. No hand-trowelled bays, no cold joints, ready for trades back on the floor in 48 hours.
Materials and systems we use in Rockbeare
Cemfloor CT-C30-F6
Cement-based liquid screed — robust, low-shrinkage, fast-drying.
Cemfloor Therm
Thermally-optimised for UFH.
PIR insulation + DPM
Build-up tuned to your build regs U-value.
What to expect on pour day in Rockbeare
- 1
Site visit and written quote
- 2
Prep — insulation, DPM, edge isolation, UFH coordination
- 3
Pump day — single-visit pour, level and spike-roll
- 4
Cover and cure for 24-48 hours
- 5
Moisture-test sign-off, floor coverings
Latest jobs across Devon



Rockbeare-area service radius
What backs our Rockbeare work
Rockbeare screed questions, answered
What postcode areas do you cover?+
Across Devon and the surrounding postcodes — EX5 is part of our core area.
How long does the floor take to dry in Rockbeare?+
Roughly one day per millimetre of depth, ambient conditions allowing. We'll give you specific guidance for your Rockbeare pour.
Do you offer a guarantee?+
As a Cemfloor-certified installer, qualifying installs are backed by a 10-year manufacturer-supported guarantee.
Can you give a fixed-price quote?+
Yes — every Rockbeare quote is a written fixed price against a defined scope. No day-rate surprises.
Do you cover Rockbeare?+
Yes — Rockbeare sits inside our regular 30-mile working radius and we have active diary there most months.
Do you handle UFH coordination?+
Yes — we work with whichever UFH installer is on your Rockbeare project and align dates with their pressure-test schedule.
Cemfloor screed across EX5
From Rockbeare to the surrounding villages, one team, one fixed price.
